BLD03-02347
| BLD-Aging Inspection | 1/19/2006 | 1/19/2006 | 1/20/2006 9:26:04 AM | | DEFR |
|
|
sent to fire
|
FIR05-00620
| INSP-Sprinkler Rough-in | 1/19/2006 | 1/19/2006 | 1/19/2006 4:56:24 PM | P | NR |
|
|
Inspection to be completed on 1/20.
|
BLD05-01864
| FIRE-Final Inspection | 1/19/2006 | 1/19/2006 | 1/19/2006 4:20:19 PM | P | NR |
|
|
The shell building and alarm permits must be finaled prior to final life safety approval for this TI permit.
|
FIR05-00315
| INSP-Final Inspection | 1/19/2006 | 1/19/2006 | 1/19/2006 2:08:39 PM | P | PASS |
|
|
UG permit finaled.
|
BLD05-02422
| FIRE-Final Inspection | 1/17/2006 | 1/19/2006 | 1/19/2006 1:47:39 PM | A | PASS |
|
|
Fire life safety is satisfactory.
|
FIR05-00526
| INSP-Final Inspection | 1/19/2006 | 1/19/2006 | 1/19/2006 1:46:22 PM | P | PASS |
|
|
Fire alarm passed final inspection.
|
FIR05-00864
| INSP-Conference | 1/17/2006 | 1/19/2006 | 1/19/2006 1:44:57 PM | P | DONE |
|
|
On site confrence to discuss project phasing as associated with the cafeteria lunchroom completion prior to the remainder of work under this permit scope.
|
BLD05-01957
| FIRE-Final Inspection | 1/18/2006 | 1/19/2006 | 1/19/2006 11:34:43 AM | A | FAIL |
|
|
Require approval of the outside fuel storage tank from FD-see note #1 on fire code review notes, provide building address as indicated on both sides of building for corner facing, provide exit discharge lighting, the provided exit sign/emergency light is non-functional at this time.
|
BLD05-02886
| FIRE-Conference | 1/18/2006 | 1/19/2006 | 1/19/2006 10:29:42 AM | A | DONE |
|
|
On site confrence regarding concealed spaces meeting the requirements of NFPA 13 2002 8.14.1.2.3 and 8.14.1.2.7.
|
FIR06-00020
| INSP-Sprinkler Rough-in/Hydro | 1/18/2006 | 1/19/2006 | 1/19/2006 10:13:38 AM | A | PART |
|
|
Overhead rough-in is acceptable for cover, final pending ceiling finish and escutcheon installation.
|
FIR05-00315
| INSP-Final Inspection | 1/19/2006 | 1/19/2006 | 1/19/2006 12:00:00 AM | P | PASS |
|
|
UG fire supply line permit passed final inspection.
|