Inspections for the day of: Tuesday, January 19, 2010.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE08-02058 ELE-Aging Inspection1/19/20101/19/20101/20/2010 3:38:27 PM DONE
no activity, see doc expire
ESC09-00806 Site Preparation1/19/20101/19/20101/20/2010 3:14:17 PM DONE
looked ok per 1-13- 10, all indoor work
ELE08-02045 ELE-Aging Inspection1/19/20101/19/20101/20/2010 3:11:41 PM DONE
no activity, see doc expire
ELE07-02871 Conference1/19/20101/19/20101/19/2010 4:25:40 PMPDONE
frank Phone #: ###-#### talked about progress on job
ESC09-00573 General Inspection1/19/20101/19/20101/19/2010 4:04:18 PMPPASS
looked ok
ESC09-00731 General Inspection1/19/20101/19/20101/19/2010 4:03:43 PMPPASS
looked ok
ESC09-00501 General Inspection1/19/20101/19/20101/19/2010 4:03:09 PMPPASS
looked ok
ESC09-00386 General Inspection1/19/20101/19/20101/19/2010 4:01:22 PMPPASS
looked ok
ESC09-00181 General Inspection1/19/20101/19/20101/19/2010 4:00:51 PMPPASS
looked ok
ELE10-00050 Electrical Rough-In1/19/20101/19/20101/19/2010 3:54:54 PMPPASS
Steve Phone #: ###-#### corrections made, called about recpt in 2nd floor room by lv cables and smoke detector, left message, ric ok
ELE09-02258 Final1/19/20101/19/20101/19/2010 3:53:09 PMPPASS
READY AFTER 12.00 Phone #: ###-#### Internet Inspection Request from: Bob Glenn ok to final
ELE09-02260 Final1/19/20101/19/20101/19/2010 2:56:39 PMPPASS
Tony Keen Phone #: ###-#### ok to final, no card to sign
ELE09-02348 Electrical Rough-In1/19/20101/19/20101/19/2010 2:10:27 PMPPASS
eric - around 2 if possible please Phone #: ###-#### met contractor, p/s u/g rec ok, affixed stickers to 7 existing meters, no esc this project, will call tomorrow for 2 new meters
ELE09-01826 Electrical Rough-In1/19/20101/19/20101/19/2010 1:17:57 PMPPASS
Steve Phone #: ###-#### called, corrections made, ric ok
ELE09-02091 Final1/15/20101/19/20101/19/2010 10:55:16 AMAPASS
george Phone #: ###-#### called, ok to final, no esc this project
ELE09-02099 Rough-In Permanent Service1/15/20101/19/20101/19/2010 10:40:34 AMACANC
Please call Dave at ###-#### for location and key to unlock the door Phone #: ###-#### Internet Inspection Request from: Scott Abbott see p/s, no esc this project
ELE09-02099 Permanent Service1/19/20101/19/20101/19/2010 10:39:30 AMAPASS
Please call Dave at ###-#### for location and key to unlock the door Phone #: ###-#### Internet Inspection Request from: Scott Abbott p/s o/h n ok, no esc this project
ELE10-00097 Conference1/16/20101/19/20101/19/2010 10:19:39 AMADONE
please call to schedule conf. Phone #: ###-#### Internet Inspection Request from: Lee VanSchoiack talked about service and re-connect after repair is done, pull box size, depth of service under building, no esc this project
ELE09-02337 Electrical Rough-In1/15/20101/19/20101/19/2010 9:12:36 AMAPART
Please inspect the Undergound for Cover. Wireman on site is Pat at ###-####. Thank you Phone #: ###-#### Internet Inspection Request from: Clint Tate u/g anop ok to cover
ELE09-02381 Rough-In Permanent Service1/19/20101/19/20101/19/2010 8:34:53 AMAPASS
READY Phone #: ###-#### Internet Inspection Request from: Bob Glenn called, ric ok, p/s u/g n ok
ELE10-00065 Final1/18/20101/19/20101/18/2010 6:52:29 PMACANC
Contact: Tom Betty, please call before going so Tom can meet you there. Phone #: ###-#### Internet Inspection Request from: Deb Gooden Inspection cancelled from web by: Deb Gooden