Inspections for the day of: Tuesday, January 19, 2010.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-02162 FIRE-Final Inspection1/19/20101/19/20101/19/2010 3:57:41 PMPFAIL
The exit light at the main exit did not function and the four exit lights in the two conference rooms did not function either. Emergency lighting is missing in the two conference rooms as well.
BLD09-00776 FIRE-Final Inspection1/19/20101/19/20101/19/2010 3:13:18 PMPFAIL
An indicator has not been provided for the keyed hardware at the tenant space exit.
BLD08-01426 FIRE-Final Inspection1/15/20101/19/20101/19/2010 3:11:55 PMAFAIL
Repair the exit sign located over the main exit. Provide exit discharge lighting as shown on the approved plans at both the front and rear exits. I tried to verify the exit discharge requirement since the occupant load was only 12 but Ron Hill was unavailable so I contacted DC Engineering and spoke to Johnathan. He stated that he thought the exit discharge lighting was required.
BLD09-01947 FIRE-Final Inspection1/19/20101/19/20101/19/2010 1:39:51 PMPPASS
Life safety passed
BLD09-00945 FIRE-Final Inspection1/18/20101/19/20101/19/2010 9:22:52 AMAPART
The life safety inspection for the main lobby/waiting area remodel of Phase 6 is passed. HC Company will repair the exit sign over the main exit doors, provide an additional emergency light in the rear corridor and provide one additional fire extinguisher as discussed. These items will be verified when the remaining rooms in the lobby/waiting area are completed.
BLD09-01838 FIRE-Final Inspection1/15/20101/19/20101/19/2010 9:13:06 AMAPASS
Fire life safety passed