Inspections for the day of: Tuesday, January 19, 2010.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01307 BLD-Conference1/19/20101/19/20101/19/2010 4:23:09 PMPPASS
Went over ADA features.
BLD09-02205 BLD-Framing/Rough-in1/15/20101/19/20101/19/2010 3:36:31 PMPCANC
Cameron-SHear inpsection Phone #: ###-####
ESC09-00252 General Inspection1/19/20101/19/20101/19/2010 3:29:40 PMPPASS
ESC permit sign posted. Site is clean. All BMP's in place.
BLD09-00705 BLD-Framing/Rough-in1/15/20101/19/20101/19/2010 3:28:43 PMPFAIL
Needs to complete the 2nd. layer of 5/8 type x rock on north soffitt. Ok to insul.
ESC09-00270 BMP Violation1/19/20101/19/20101/19/2010 2:56:56 PMPPASS
BLD09-00737 BLD-Framing/Rough-in1/18/20101/19/20101/19/2010 2:52:38 PMPPASS
Fire Rate eave Phone #: ###-#### Internet Inspection Request from: James Larkin. Verified 2layers of 5/8 type x rock at soffitt. ok.
BLD09-01307 BLD-Conference1/18/20101/19/20101/19/2010 11:55:08 AMACANC
Phone #: ###-#### Internet Inspection Request from: Mike Walling
BLD09-02205 BLD-Framing/Rough-in1/15/20101/19/20101/19/2010 11:54:32 AMACANC
Shear-Cameron Phone #: ###-####
BLD09-00739 BLD-Framing/Rough-in1/18/20101/19/20101/19/2010 10:20:00 AMAPASS
Fire Wall consruciton / Overbuild Areas Phone #: ###-#### Internet Inspection Request from: James Larkin. Base and face layers of 5/8 type x rock for two hr. fire walls, also at overbuild areas as well. Also verified fire rated ply at laydown parapet.
BLD09-00740 BLD-Framing/Rough-in1/18/20101/19/20101/19/2010 10:18:20 AMAPASS
Fire Wall construction / Overbuild Areas Phone #: ###-#### Internet Inspection Request from: James Larkin. Base and face layers ok as well as overbuild. Also verified fire rated ply at lay down parapets.
ESC09-00273 BMP Violation1/19/20101/19/20101/19/2010 10:16:58 AMAPASS
Sidewalks and gutterpan have been swept.
ESC09-00274 BMP Violation1/19/20101/19/20101/19/2010 10:16:27 AMAPASS
Sidewalks and gutter pan have been swept.
ESC09-00757 BMP Violation1/19/20101/19/20101/19/2010 9:38:41 AMAPASS
Site has been cleaned. ok.
BLD09-02113 BLD-Energy code compliance1/15/20101/19/20101/19/2010 9:38:17 AMAPASS
Eric Phone #: ###-####
BLD09-02113 BLD-Framing/Rough-in1/19/20101/19/20101/19/2010 9:38:07 AMAPASS
Eric Phone #: ###-####. Reviewed new truss engineering and inspected 2ply truss fix. ok. Also verified the 2 layers of 5/8 type x rock at soffitts. ok. all issues resolved.