FIR10-00398
| INSP-Final Inspection | 1/18/2011 | 1/19/2011 | 1/21/2011 1:39:41 PM | A | PART |
|
|
Inspection notes 1/19/11- Completed project walkthrough- noted some locations where audibility may be insufficient, cd rating at the second floor breakroom adjusted, one DD is supply side located, "shadowed" areas to be verified during functional testing. Verified as-builts per request.
|
BLD10-02986
| FIRE-Conference | 1/20/2011 | 1/19/2011 | 1/20/2011 9:20:17 AM | A | PEND |
|
|
Pending FIR11-00024- ref. previous activity note.
|
FIR10-00495
| INSP-Sprinkler Rough-in | 1/19/2011 | 1/19/2011 | 1/19/2011 2:58:55 PM | P | DEFR |
|
|
Inspection request intended for FIR10-00569 per contractor.
|
FIR10-00585
| INSP-Final Inspection | 1/19/2011 | 1/19/2011 | 1/19/2011 2:53:24 PM | A | PASS |
|
|
Fire alarm permit finaled.
|
FIR10-00631
| INSP-Final Inspection | 1/18/2011 | 1/19/2011 | 1/19/2011 2:51:48 PM | A | PART |
|
|
bryan Phone #: ###-####
|
FIR10-00616
| INSP-Final Inspection | 1/18/2011 | 1/19/2011 | 1/19/2011 1:08:28 PM | A | NR |
|
|
justin Phone #: ###-####
|
FIR10-00425
| INSP-Final Inspection | 1/18/2011 | 1/19/2011 | 1/19/2011 10:55:17 AM | A | CANC |
|
|
I''m coming from Kuna please give me atleast a 30 minute heads up. Thx, Clarence Phone #: ###-#### >> Inspection requested via web by Clarence McLain Inspection cancelled from web by: John Venche
|
FIR10-00512
| INSP-Final Inspection | 1/18/2011 | 1/19/2011 | 1/19/2011 10:23:45 AM | A | PART |
|
|
For verification of previous c/n items including FDC relocation, rooms without ceilings, QR head at one mech. closet, etc. Discussed riser monitoring, schedule for final acceptance testing.
|
FIR06-00798
| FIR-Aging Inspection | 1/19/2011 | 1/19/2011 | 1/19/2011 10:06:55 AM | | PEND |
|
|
|
FIR10-00501
| FIR-Aging Inspection | 1/19/2011 | 1/19/2011 | 1/19/2011 10:02:07 AM | | DONE |
|
|
Site visit confirmed work in progress, discussed WP notification appliance at the restroom equipped with a shower.
|
BLD10-01604
| FIRE-Final Inspection | 1/18/2011 | 1/19/2011 | 1/19/2011 9:59:26 AM | A | PEND |
|
|
Fire life safety final pending project related fire sprinkler permit work. Some items incomplete at this time.
|
FIR10-00616
| INSP-Sprinkler Rough-in/Hydro | 1/18/2011 | 1/19/2011 | 1/19/2011 9:57:46 AM | A | NR |
|
|
Overhead hydrostatic test not ready due to system impairment.
|
BLD11-00023
| FIRE-Final Inspection | 1/14/2011 | 1/19/2011 | 1/19/2011 9:56:36 AM | A | PASS |
|
|
Fire life safety inspection completed satisfactory.
|