BLD16-00083
| FIRE-Conference | 1/19/2016 | 1/19/2016 | 1/19/2016 3:13:53 PM | P | DONE |
|
|
I went over life safety requirements with Elliott Phone #: ###-####. Looks like we need a sprinkler permit and dooor hardware.
|
BLD15-04451
| FIRE-Final Inspection | 1/19/2016 | 1/19/2016 | 1/19/2016 2:36:59 PM | P | FAIL |
|
|
Repair exit signs, provide emergency lighting through out the first and second floors including the stairwells. Provide ADA hardware on the pocket door.
|
FIR12-00474
| FIR-Aging Inspection | 1/19/2016 | 1/19/2016 | 1/19/2016 11:49:14 AM | | NR |
|
|
Jeff is going to follow up with Tim about possible plan modifications due to the scope of work changing.
|
FIR15-00425
| INSP-Sprinkler Rough-in | 1/18/2016 | 1/19/2016 | 1/19/2016 11:43:26 AM | A | FAIL |
|
|
I stopped the rough-in inspection due to the installation not matching the approved plans. Branchlines have been added and several of the branchlines are not in the same location as the plans show them. It appears that the upright sprinkler heads have been hydraulically calculated and are shown placed directly on the branchlines. However they are actually installed on 1" armovers which changes the hydraulic calculations. I noted that there are additional fittings on the 4" main and the 2" branchlines. A low point drain will be needed as discussed. Plans will need to be resubmitted with all changes and revised hydraulic calculations.
|
FIR15-00814
| INSP-Final Inspection | 1/18/2016 | 1/19/2016 | 1/19/2016 11:35:50 AM | A | FAIL |
|
|
Not ready for a final yet but the rough-in passed and the piping can be covered.
|
BLD15-04268
| FIRE-Final Inspection | 1/18/2016 | 1/19/2016 | 1/19/2016 11:32:34 AM | A | PASS |
|
|
Life safety passed
|
FIR15-00717
| INSP-Sprinkler Rough-in | 1/18/2016 | 1/19/2016 | 1/19/2016 11:31:43 AM | A | PASS |
|
|
Tenting passed. Piping can be covered.
|
FIR15-00715
| INSP-Sprinkler Rough-in | 1/18/2016 | 1/19/2016 | 1/19/2016 7:36:50 AM | A | PASS |
|
|
Tenting passed. Piping can be covered.
|