Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00912 INSP-Sprinkler Rough-in1/19/20161/19/20161/19/2016 2:00:15 PMPPART
Rough to cover inspection performed for underground piping. Partial cover approved for east to west piping, still need thrust block on 90 going to building as well as thrust block for riser inside. Contractor will schedule inspection for the rest of underground when complete.
FIR16-00039 INSP-Final Inspection1/19/20161/19/20161/19/2016 1:34:04 PMPPASS
Final commercial hood fire suppression system inspection passed/complete.
FIR15-00906 INSP-Final Inspection1/15/20161/19/20161/19/2016 1:33:03 PMAPASS
Final fire alarm inspection passed/complete.
FIR16-00031 INSP-Sprinkler Rough-in/Hydro1/18/20161/19/20161/19/2016 11:43:08 AMAPART
Rough to cover inspection for underground stub in to building. Area inspected only area approved for cover, contractor will schedule inspection for remaining underground when installed.
BLD15-00088 FIRE-Final Inspection1/19/20161/19/20161/19/2016 11:39:32 AMPDONE
Not a final life fire safety inspection, inspection request for rough to cover on rock-wool installation and fire caulk penetrations. No fire sprinklers, no fire alarms. Life fire safety inspection will need to be performed at project completion.
BLD15-00087 FIRE-Final Inspection1/19/20161/19/20161/19/2016 11:38:50 AMPDONE
Not a final life fire safety inspection, inspection request for rough to cover on rock-wool installation and fire caulk penetrations. No fire sprinklers, no fire alarms. Life fire safety inspection will need to be performed at project completion.
FIR15-00820 INSP-Final Inspection1/16/20161/19/20161/19/2016 11:23:28 AMAPART
Trip test for dry system complete, final fire sprinkler inspection complete, dry pendant heads for dry system canopy are too long, dry pendant heads on order and will be replaced when received, once heads are changed the fire sprinkler system can be finaled.
BLD15-02516 FIRE-Final Inspection1/19/20161/19/20161/19/2016 10:41:34 AMPPASS
Fire sprinkler inspection complete, fire alarm inspection complete. Life fire safety passed/complete.
FIR15-00396 INSP-Conference1/18/20161/19/20161/19/2016 10:32:33 AMADONE
Fire conference complete, contacted Kevin ###-####, had some questions for fire truck access for part of the project when complete, will discuss options with my supervisor and get in contact with Kevin to pass on information.
BLD15-03214 FIRE-Final Inspection1/19/20161/19/20161/19/2016 10:28:38 AMPPASS
Fire sprinkler inspection complete (FIR16-0003) No fire alarm modifications. Life fire safety passed/complete.
BLD15-04176 FIRE-Final Inspection1/19/20161/19/20161/19/2016 10:06:15 AMPCANC
Contractor will reschedule inspection to coincide with fire hood suppression and fire alarms. Inspection request cancelled.
FIR16-00021 INSP-Final Inspection1/19/20161/19/20161/19/2016 9:40:32 AMPCANC
Call prior to going Phone #: 2089414511 >> Inspection requested via mobile web by Nathan Price Inspection cancelled via mobile web on Tuesday, January 19, 2016.
FIR16-00004 INSP-Final Inspection1/18/20161/19/20161/19/2016 9:29:55 AMACANC
Spoke with Don Kartchner, inspection request for this inspection cancelled, wrong FIR permit was inserted, corrected per coversation with Don, correct inspection scheduled.
BLD15-02346 FIRE-Final Inspection1/18/20161/19/20161/19/2016 9:23:55 AMAPART
Project being worked in phases, phase 1 fire alarm inspection complete, phase 1 fire sprinkler inspection complete. Life fire safety passed/complete for phase 1, notated city approved drawings with red ink inspected, made note next to Area 1 Box for life fire safety.
BLD15-00137 FIRE-Final Inspection1/15/20161/19/20161/19/2016 8:48:47 AMAPASS
Previously noted items complete. Fire sprinkler inspections complete, fire alarm inspections complete. Life fire safety passed/complete
FIR16-00003 INSP-Final Inspection1/19/20161/19/20161/19/2016 8:32:27 AMPPASS
Final inspection for fire sprinkler system passed/complete