BLD15-04184
| BLD-Framing/Rough-in | 1/18/2017 | 1/19/2017 | 1/20/2017 6:16:37 AM | A | PART |
|
|
Level 2 Framing Phone #: ###-#### Inspection requested via web by Ami Tracy ok to one side last two areas
|
BLD15-03835
| BLD-Framing/Rough-in | 1/18/2017 | 1/19/2017 | 1/20/2017 6:15:16 AM | A | PART |
|
|
Inspection request for Metal Stud Framing at East Elevation of Floors 1 and 2. Phone #: ###-#### Inspection requested via web by Carl Benjamin ok to cover ext e wall
|
BLD16-01727
| BLD-Final | 1/19/2017 | 1/19/2017 | 1/20/2017 6:14:22 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
BLD16-03291
| BLD-Energy code compliance | 1/19/2017 | 1/19/2017 | 1/20/2017 6:13:59 AM | P | PASS |
|
|
Insulation // Josh Phone #: ###-####
|
BLD16-04056
| BLD-Foundation | 1/18/2017 | 1/19/2017 | 1/19/2017 2:26:36 PM | P | CANC |
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|