Inspections for the day of: Tuesday, January 2, 1996.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE95-02426 INSP - Electrical Rough-In12/29/19951/2/19961/3/1996 12:00:00 AMAPASS
01/02/96 315 - WIRE ADDITION TO CLUBHOUSE/OFFICE 09 ok jf com. rem posted notice for good clean ,with no big rocks for fill in trench for PVC conduit
ELE95-02289 INSP - Final1/2/19961/2/19961/3/1996 12:00:00 AMPPASS
01/02/96 315 - WIRE LOCATIONS FOR TELEPHONE SYSTEM ENTIRE SPACE 14 ok jf
ELE95-01569 INSP - Ele Rough-In/Perm Svc1/2/19961/2/19961/3/1996 12:00:00 AMPPASS
01/02/96 315 - THANK YOU ON THIS ONE 09&53 ok jf 13rms 1a/c 200a u/g new,09&53 was done by me on 10/19/95 it must have got lost in the works?
ELE95-01633 INSP - Final1/2/19961/2/19961/3/1996 12:00:00 AMPPASS
01/02/96 315 - 14 ok jf
ELE95-01411 INSP - Final1/2/19961/2/19961/2/1996 12:00:00 AMAPASS
FINAL OK JACK DONE THIS FOR TOM
ELE95-02428 INSP - Permanent service12/29/19951/2/19961/2/1996 12:00:00 AMAFAIL
01/02/96 315 - INSTALL 20 AMP CIRCUIT AND DISCONNECT FOR U/G POWER SUPPL 53 failed $25:00 reinspection fee due and cor. posted NEC,250-79(b),110-
ELE95-02324 INSP - T/S and Final1/2/19961/2/19961/2/1996 12:00:00 AMPPASS
01/02/96 315 - 49&14 ok jf u/g new
ELE95-01569 INSP - Final1/2/19961/2/19961/2/1996 12:00:00 AMPNR
01/02/96 315 - THIS ONE DOESNT EVEN SHOW A P/S OR R/I PLEASE REPLY BACK IN YOUR EMAIL THANKS MONICA 14 NR jf sur. posted needs lights in laundry room and MB closet, top of
ELE95-02101 INSP - Final1/2/19961/2/19961/2/1996 12:00:00 AMPPASS
01/02/96 315 - NOT SHOWNING THAT YOU WENT OUT AGAIN FOR THE FINAL 14 ok jf final was done by GKahn on 12/27/95
ELE95-00867 INSP - Ele Rough-In/Perm Svc1/2/19961/2/19961/2/1996 12:00:00 AMPPASS
01/02/96 315 - REINSPECTION 09&53 ok jf com. u/g new