Inspections for the day of: Tuesday, January 2, 1996.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM95-01584 INSP - Plumbing Rough-in1/2/19961/2/19961/2/1996 12:00:00 AM PASS
/ / 330 - this was 6711 r/i ok dcva not set
PLM95-01585 INSP - Plumbing Rough-in1/2/19961/2/19961/2/1996 12:00:00 AM PASS
/ / 330 - this was 6705 r/i ok dcva not in
PLM95-02010 INSP - Water heater (elec)1/2/19961/2/19961/2/1996 12:00:00 AM NH
/ / 330 -
PLM95-02023 INSP - Water lines FINAL1/2/19961/2/19961/2/1996 12:00:00 AM PASS
/ / 330 -
PLM95-00723 INSP - Plumbing Rough-in12/29/19951/2/19961/2/1996 12:00:00 AMAPART
12/29/95 330 - stopped by no additional r/i at this time
PLM95-01445 INSP - Final1/2/19961/2/19961/2/1996 12:00:00 AMPNR
01/02/96 330 -
PLM95-01584 INSP - Plumbing Rough-in1/2/19961/2/19961/2/1996 12:00:00 AMPFAIL
01/02/96 330 - no address, 1" to each unit, mid-story stays, tandp and pan drain required
PLM95-01585 INSP - Plumbing Rough-in1/2/19951/2/19961/2/1996 12:00:00 AMPFAIL
01/02/96 330 - t&p and pan drain required, 1" to hesder for each unit, m no address
PLM95-01694 INSP - Final1/2/19961/2/19961/2/1996 12:00:00 AMPFAIL
01/02/96 330 - 3-wc,5-lav,3-tub,1-sh,2-si,1-wb,1-wh pipe t&p drain to floor, install shower strainer