Inspections for the day of: Thursday, January 2, 1997.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC96-02764 INSP - Final1/2/19971/2/19971/2/1997 12:00:00 AM PASS
/ / 337 - FNL -OK FINAL
MEC96-03976 INSP - Final12/23/19961/2/19971/2/1997 12:00:00 AMAPASS
01/02/97 337 - PAT CLOVER ###-#### FAB 1 REAR DIFFUSION INFO IN BOX RGHN-OK ROUGH IN
MEC96-03976 INSP - Final12/23/19961/2/19971/2/1997 12:00:00 AMAPASS
01/02/97 337 - PAT CLOVER ###-#### FAB 1 REAR DIFFUSION INFO IN BOX RGHN-OK ROUGH IN
MEC96-04030 INSP - Rough-in & Gas Pressure12/31/19961/2/19971/2/1997 12:00:00 AMACANC
01/02/97 337 - to be done by 326
MEC96-04007 INSP - Rough-in & Gas Pressure1/2/19971/2/19971/2/1997 12:00:00 AMPPASS
01/02/97 337 - RGHN-OK ROUGH IN GP -OK GAS PIPING
MEC96-02764 INSP - Final1/2/19971/2/19971/2/1997 12:00:00 AMPCANC
01/02/97 337 - this was done in the am
MEC96-02764 INSP - Final1/2/19971/2/19971/2/1997 12:00:00 AMPCANC
01/02/97 337 - this was done in the am
MEC96-03480 INSP - Final1/2/19971/2/19971/2/1997 12:00:00 AMPPASS
01/02/97 337 - FNL -OK FINAL
MEC96-03480 INSP - Final1/2/19971/2/19971/2/1997 12:00:00 AMPPASS
01/02/97 337 - FNL -OK FINAL
MEC96-03688 INSP - Retro Fit (check note)1/2/19971/2/19971/2/1997 12:00:00 AMPPASS
01/02/97 337 - CALL BARBARA AT ###-#### FOR ACCESS FNL -OK FINAL
MEC96-03937 INSP - Retro Fit (check note)12/31/19961/2/19971/2/1997 12:00:00 AMPCANC
01/02/97 337 - HE WILL BE HOME AT 4:15 to be done by 326
MEC96-03950 INSP - Rough-in & Gas Pressure1/2/19971/2/19971/2/1997 12:00:00 AMPPASS
01/02/97 337 - GP -OK GAS PIPING RGHN-OK ROUGH IN