BLD00-03335
| BLD-Framing/Rough-in | 12/28/2000 | 1/2/2001 | 1/2/2001 12:00:00 AM | A | FAIL |
|
|
LARRY-- ###-#### not built per approved plan need to resubmit for changes or have arch. address ele panel in rated corridor wall not drawn on aproved plan. 1/2/2001 10:45:10 AM
|
BLD00-03143
| BLD-Framing/Rough-in | 12/29/2000 | 1/2/2001 | 1/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 14:38:27. Contact: ###-####.
|
BLD00-02375
| BLD-Concrete | 12/29/2000 | 1/2/2001 | 1/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 14:40:38. Contact: . placed with special insp. pending report. 1/2/2001 2:49:28 PM
|
BLD00-01261
| BLD-Framing/Rough-in | 12/29/2000 | 1/2/2001 | 1/2/2001 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 17:21:38. Contact: ###-####. no access to canopy framing. 1/2/2001 11:12:25 AM
|
BLD00-01563
| BLD-Concrete | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 07:03:37. Contact: ###-####. placed with special insp.pending report. 1/2/2001 3:23:29 PM
|
BLD00-02025
| BLD-Framing/Rough-in | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | PART |
|
|
###-#### ok for cover pending reinsp on shafts and fire blk at ceilling line of unusable space at west wall. 1/2/2001 3:22:25 PM
|
BLD00-03384
| BLD-Footing | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | PART |
|
|
RE BAR WAYNE ###-#### placed with special insp. 1/2/2001 3:23:09 PM
|
BLD00-00732
| BLD-Final | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | FAIL |
|
|
###-#### sheer planel and hardware not per aproved plan need arch. to resubmit as built or reconst to meet plan. 1/2/2001 3:51:34 PM
|