ELE00-04692
| Electrical Rough-In | 12/29/2000 | 1/2/2001 | 1/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 10:05:06. Contact: ###-####. ok cover 2 floor boxes and underground conduit 1/2/2001 11:45:12 AM
|
ELE00-04917
| Rough-In Permanent Service | 12/29/2000 | 1/2/2001 | 1/2/2001 12:00:00 AM | A | PASS |
|
|
###-#### p/s u/g n ok - ok cover 1/2/2001 9:56:01 AM
|
ELE00-03793
| Final | 12/29/2000 | 1/2/2001 | 1/2/2001 12:00:00 AM | A | PART |
|
|
wrk ###-#### Bob conf they need switch for all house fan gfci wired wrong needs fixed 1/2/2001 9:39:07 AM
|
ELE00-04572
| Electrical Rough-In | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 07:26:03. Contact: ###-####. ok cover floor 1/2/2001 9:39:42 AM
|
ELE01-00001
| Rough-In Permanent Service | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | PASS |
|
|
###-#### p/s u/g n ok - -ok cover ri 1/2/2001 4:04:43 PM
|
ELE01-00003
| Temporary Service | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | PASS |
|
|
ALAN ###-#### T/P t/s u/g n ok 1/2/2001 1:00:28 PM
|
ELE00-02408
| Electrical Rough-In | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | FAIL |
|
|
FRANK-- ###-#### R/I not ready conf 1/2/2001 12:40:25 PM
|
ELE00-02409
| Electrical Rough-In | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | PASS |
|
|
###-#### FRANK R/I ok cover first and second floors 1/2/2001 12:41:19 PM
|