MIS00-00306
| BLD-Conference | 12/29/2000 | 1/2/2001 | 1/2/2001 12:00:00 AM | A | PASS |
|
|
Report of working w/out permits.
Stop work order issued @ 8:55 am on 1/02/01, addition on back of house, t/w home owner said contractor said they did not need permit until they were done. Should double fee contractor. 1/2/2001 9:30:13 AM
|
BLD00-02804
| BLD-Framing/Rough-in | 12/28/2000 | 1/2/2001 | 1/2/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 12/28/2000 at 09:53:20. Contact: ###-####.
420 will do 1/2/2001 11:26:09 AM
|
BLD00-03644
| BLD-Foundation | 12/29/2000 | 1/2/2001 | 1/2/2001 12:00:00 AM | A | PART |
|
|
foundation stem walls Ed ###-####
wip, ok w/ verbal corrections 1/2/2001 9:46:06 AM
|
BLD00-03419
| BLD-Framing/Rough-in | 12/29/2000 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | CANC |
|
|
drew ###-#### call 1st
|
BLD00-01876
| BLD-Framing/Rough-in | 12/29/2000 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 13:55:40. Contact: ###-####.
conf. on nailing 1/2/2001 4:08:36 PM
|
BLD00-02473
| BLD-Framing/Rough-in | 12/29/2000 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 16:52:05. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/02/2001 at 11:25:11.
|
BLD00-01736
| BLD-Framing/Rough-in | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 07:26:28. Contact: .
|
BLD00-01642
| BLD-Framing/Rough-in | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | PASS |
|
|
FR INSP-- GLEN ###-####
c/n ok, ok to insulate 1/2/2001 1:30:01 PM
|
BLD00-01175
| BLD-Framing/Rough-in | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | PASS |
|
|
reinspection rob ###-####
framing ok // insulation ok// ok to sheet rock 1/2/2001 3:36:08 PM
|
BLD00-03347
| BLD-Final | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 10:37:31. Contact: ###-####. AS LATE AS POSSIBLE
trades not signed off, conference on codes, etc.,,, this will be only part of project, temp occ. only once approved 1/2/2001 5:09:16 PM
|
BLD00-01941
| BLD-Framing/Rough-in | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | PART |
|
|
FR INSP- JOE ###-####
int. stairs, roof screen wall ok to cover pending special inspection reports, no electrical 1/2/2001 1:27:26 PM
|
BLD00-03640
| BLD-Footing | 1/2/2001 | 1/2/2001 | 1/2/2001 12:00:00 AM | P | PART |
|
|
Jeff ###-####
|