Inspections for the day of: Friday, January 2, 2004.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-02212 BLD-Other12/31/20031/2/20041/2/2004 12:00:00 AMAFAIL
stair replacement///###-#### chuck handrail needs extention at top. 1/5/2004 8:36:40 AM
MEC03-02901 Pressure Test12/31/20031/2/20041/2/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/31/2003 at 1:21:46 PM. Contact: ###-####.
MEC03-02901 Final12/31/20031/2/20041/2/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/31/2003 at 1:21:58 PM. Contact: ###-####.
BLD03-02798 BLD-Final1/2/20041/2/20041/2/2004 12:00:00 AMAPASS
BLD03-02436 BLD-Final1/2/20041/2/20041/2/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 1/2/2004 at 10:35:01 AM. Contact: ###-####.
BLD03-02563 BLD-Footing12/29/20031/2/20041/2/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/29/2003 at 2:08:12 PM. Contact: ###-####. placed w/si 1/2/2004 12:36:13 PM
BLD03-02254 BLD-Footing12/29/20031/2/20041/2/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/29/2003 at 2:13:29 PM. Contact: ###-####. placed w/si 1/2/2004 12:36:28 PM
BLD03-02572 BLD-Framing/Rough-in1/2/20041/2/20041/2/2004 12:00:00 AMPPART
don; Phone #: ###-#### Internet Inspection Request from: Annette Moore need to address stair tower with arch. 1/2/2004 1:54:06 PM
BLD03-02410 BLD-Framing/Rough-in1/2/20041/2/20041/2/2004 12:00:00 AMPPASS
gary ###-####
BLD01-01536 BLD-Final1/2/20041/2/20041/2/2004 12:00:00 AMPPASS
joe-- ###-####
MEC03-03514 Rough-in1/2/20041/2/20041/2/2004 12:00:00 AMPPART
brad-- ###-#### gas ok c/n posted. 1/2/2004 2:19:47 PM
MEC03-03512 Rough-in1/2/20041/2/20041/2/2004 12:00:00 AMPPART
brad- ###-#### gas ok / c/n posted 1/2/2004 2:19:28 PM