PLM03-02448
| Final | 1/2/2004 | 1/2/2004 | 1/2/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/2/2004 at 7:54:54 AM. Contact: ###-####. final ok 1/2/2004 2:49:52 PM
|
PLM03-03905
| Final | 1/2/2004 | 1/2/2004 | 1/2/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/2/2004 at 7:56:03 AM. Contact: ###-####. final ok 1/2/2004 2:49:59 PM
|
PLM03-03966
| Plumbing Rough-in | 1/2/2004 | 1/2/2004 | 1/2/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/2/2004 at 7:58:09 AM. Contact: ###-####.ri ok with nail plates at piping with in 1" of face of studs or plate. 1/2/2004 2:36:09 PM
|
PLM03-03952
| Final | 1/2/2004 | 1/2/2004 | 1/2/2004 12:00:00 AM | P | PART |
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore top ri ok just needs to change out a tee in the crawlspace to a combo and hang waste. 1/2/2004 1:47:53 PM
|
PLM03-03302
| Final | 1/2/2004 | 1/2/2004 | 1/2/2004 12:00:00 AM | P | PASS |
|
|
criage ###-#### final ok 1/2/2004 2:08:22 PM
|