MIS06-00066
| MIS-Aging Inspection | 1/2/2007 | 1/2/2007 | 1/3/2007 12:41:07 PM | | NR |
|
|
Needs plumbing final.
|
BLD06-00939
| BLD-Footing | 1/2/2007 | 1/2/2007 | 1/3/2007 8:31:04 AM | P | CANC |
|
|
donnie ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD06-00932
| BLD-Footing | 1/2/2007 | 1/2/2007 | 1/2/2007 4:13:01 PM | P | CANC |
|
|
donnie ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD06-00931
| BLD-Footing | 1/2/2007 | 1/2/2007 | 1/2/2007 4:11:06 PM | P | CANC |
|
|
donnie ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD06-02741
| BLD-Other | 1/2/2007 | 1/2/2007 | 1/2/2007 2:22:32 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 1/2/2007 at 8:09:36 AM. Contact: ###-####. Ceiling grid not installed as per approved plan. Also needs other ri insp. above grid.
|
BLD06-00934
| BLD-Footing | 1/2/2007 | 1/2/2007 | 1/2/2007 1:12:47 PM | P | PART |
|
|
wip. Perimeter footings.
|
BLD06-00933
| BLD-Footing | 1/2/2007 | 1/2/2007 | 1/2/2007 1:11:13 PM | P | PART |
|
|
wip. Perimeter footings.
|
BLD06-00932
| BLD-Footing | 1/2/2007 | 1/2/2007 | 1/2/2007 1:10:07 PM | P | PART |
|
|
wip. Perimeter footings.
|
BLD06-00931
| BLD-Footing | 1/2/2007 | 1/2/2007 | 1/2/2007 1:09:07 PM | P | PART |
|
|
perimeter footing. wip
|
BLD06-00984
| BLD-Final | 12/29/2006 | 1/2/2007 | 1/2/2007 9:51:40 AM | A | NR |
|
|
brandon ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs mech. final, egress ladders at window wells, driveway still at property line, 3ft. setback is required.
|
BLD06-02841
| BLD-Foundation | 12/28/2006 | 1/2/2007 | 1/2/2007 9:29:06 AM | A | PART |
|
|
dan - stem wall ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. wip. perimeter stemwalls.
|