ESC13-00492
| General Inspection | 12/31/2013 | 12/31/2013 | | | |
|
|
|
BLD13-00960
| BLD-Final | 1/2/2014 | 1/2/2014 | 1/2/2014 3:22:15 PM | P | PEND |
|
|
Paula Phone #: ###-####. Pending zoning.
|
BLD13-03408
| BLD-Conference | 1/2/2014 | 1/2/2014 | 1/2/2014 2:47:27 PM | P | DONE |
|
|
Bob ###-####
|
BLD13-03304
| BLD-Final | 12/31/2013 | 1/2/2014 | 1/2/2014 2:25:01 PM | P | PEND |
|
|
Hal Zimmerman Phone #: ###-####. Will be ok for perm occ. once mech. has finaled.
|
BLD13-01539
| BLD-Other | 1/2/2014 | 1/2/2014 | 1/2/2014 2:23:57 PM | P | PASS |
|
|
rebar insp //Charles Phone #: ###-####. Interior slab on grade, 4 inch and 6 inch slabs for phase 1 part B at gridlines 11-13/AA-J 8-13/AA-C.
|
BLD13-01808
| BLD-Final | 12/30/2013 | 1/2/2014 | 1/2/2014 9:59:39 AM | A | NR |
|
|
there is a key in the outlet box on the front porch. Phone #: ###-#### >> Inspection requested via web by Paul Thompson. Needs mech. rough in inspection, post address. Correction notice posted.
|
BLD13-01808
| BLD-Blower Door Test Results | 1/2/2014 | 1/2/2014 | 1/2/2014 9:12:41 AM | A | DONE |
|
|
3.3
|
GCB13-00149
| GCB-Energy | 12/31/2013 | 1/2/2014 | 1/2/2014 8:47:34 AM | A | PASS |
|
|
Willie ###-####
|