MIS17-00324
| MIS-Aging Inspection | 1/2/2018 | 1/2/2018 | 1/9/2018 9:56:04 AM | | DONE |
|
|
|
MIS17-00325
| MIS-Aging Inspection | 1/2/2018 | 1/2/2018 | 1/9/2018 9:55:51 AM | | DONE |
|
|
|
BLD17-00259
| BLD-Aging Inspection | 1/2/2018 | 1/2/2018 | 1/9/2018 9:55:00 AM | | PEND |
|
|
|
BLD17-02943
| BLD-Framing/Rough-in | 1/2/2018 | 1/2/2018 | 1/2/2018 10:01:17 PM | P | NR |
|
|
Mark and air seal Phone #: ###-####,, walk through only,, needs mechanical 1st
|
BLD17-01669
| BLD-Final | 12/29/2017 | 1/2/2018 | 1/2/2018 3:46:29 PM | P | PEND |
|
|
Joe Phone #: ###-####,,, still needing historical final
|
BLD17-04077
| BLD-Wall Bracing | 1/2/2018 | 1/2/2018 | 1/2/2018 3:45:12 PM | P | PASS |
|
|
Eric Phone #: ###-####
|
BLD17-02214
| BLD-Framing/Rough-in | 1/2/2018 | 1/2/2018 | 1/2/2018 2:10:11 PM | P | PART |
|
|
Manny Phone #: ###-####,, see plans for corrections,, need hanger nails,, justify paralam vs. glue lam per plan note,, ok to insulate,, will need tempered glass by final
|
BLD16-04594
| BLD-Footing | 12/29/2017 | 1/2/2018 | 1/2/2018 1:31:05 PM | A | PART |
|
|
Pat Phone #: ###-####,, cold weather provisions in place,, work in progress,, per plan,, ok to pour when ready
|
BLD16-04550
| BLD-Framing/Rough-in | 12/29/2017 | 1/2/2018 | 1/2/2018 1:25:58 PM | A | PART |
|
|
Ron Phone #: ###-####,, firewall fix has been established ,, ok to continue and insulate
|
BLD16-04549
| BLD-Framing/Rough-in | 12/29/2017 | 1/2/2018 | 1/2/2018 1:24:25 PM | A | PASS |
|
|
Ron Phone #: ###-####
|
BLD17-04269
| BLD-Final | 1/1/2018 | 1/2/2018 | 1/2/2018 1:23:20 PM | A | PEND |
|
|
Phone #: ###-#### Inspection requested via web by greg bauer/// needs address posted, historical,, ok from engineer on connection from plan,, bolts vs. post/beam hardware
|
BLD14-00374
| BLD-Framing/Rough-in | 1/2/2018 | 1/2/2018 | 1/2/2018 12:00:00 AM | P | CANC |
|
|
Kelly Phone #: ###-#### // cancelled per email from Kelly 1/2/18 @ 11:15am
|