ELE18-03434
| Final | 1/2/2019 | 1/2/2019 | 1/2/2019 2:59:07 PM | P | PASS |
|
|
Combo for door is 2360 Thanks Dustin Phone #: ###-#### Inspection requested via web by Dustin Kuester Final ok
|
ELE18-03320
| Electrical Rough-In | 1/2/2019 | 1/2/2019 | 1/2/2019 2:35:48 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Level 3 office grid only cloud not ready rough in ok cover
|
ELE18-04558
| Final | 1/2/2019 | 1/2/2019 | 1/2/2019 1:37:56 PM | P | FAIL |
|
|
JR. Phone #: ###-#### Inspection requested via web by Sean DeLacy IECC 405 2- Lighting controls mandatory. Occupancy sensor or manual control to reduce lighting output by 50% required. NEC 110.3- Unable to locate emergency ballast luminaires as noted on print. 400.12 (2) and (5)- Flexible cords shall not be run through suspended ceilings or be run above suspended ceilings.
|
ELE18-04864
| Rough-In Permanent Service | 12/31/2018 | 1/2/2019 | 1/2/2019 10:23:21 AM | A | PASS |
|
|
Please let me know when done text or phone call Phone #: ###-#### Inspection requested via web by Thomas wilson Chassis bond complete on north side. Underground rough in ok cover p/s u/g rec ok
|
ELE18-04722
| Electrical Rough-In | 12/28/2018 | 1/2/2019 | 1/2/2019 9:28:05 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Lance Litchy Will recall when ready
|