Inspections for the day of: Wednesday, January 2, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-03161 ELE-Aging Inspection1/2/20191/2/20191/9/2019 5:29:21 AM DONE
Please schedule a final inspection.
ELE13-02096 ELE-Aging Inspection1/2/20191/2/20191/7/2019 6:28:17 AM DONE
Talked to Brad at Valley West. He is going to look into address in question for a final inspection.
ELE18-04853 Temporary Service12/28/20181/2/20191/2/2019 2:31:15 PMPPASS
Phone #: ###-#### Inspection requested via web by Greg Idsinga t/s o/h n ok
ELE18-03963 Final1/2/20191/2/20191/2/2019 2:13:08 PMPPASS
Phone #: ###-#### Inspection requested via web by Emmet Bushman Ok final.
ELE18-03743 Final1/2/20191/2/20191/2/2019 12:56:58 PMPPASS
garage code 1905 Phone #: ###-#### Inspection requested via web by kevin blackmon Ok final. All lockouts installed where needed. 3/0 blank installed in ceiling in mstr bath which looks like possible tub location.
ELE19-00005 Electrical Rough-In1/2/20191/2/20191/2/2019 12:00:43 PMPPASS
CONTACT: DERRICK KAMPER. Conduit/cover inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover 6-3/4" pvc at NE corner in lobby.
ELE18-03747 Final1/2/20191/2/20191/2/2019 11:29:06 AMPNR
garage code 6365 Phone #: ###-#### Inspection requested via web by Dan Rohl
ELE18-01685 Permanent Service12/31/20181/2/20191/2/2019 11:05:18 AMAPASS
This was inspected and passed once already but denied by the power company so I had to change out the meter-main Phone #: ###-#### Inspection requested via web by Joe Easley Existing installation of meter main with red handle bypass switch on supply side, not accepted as per IDP. New install of meter main with 2-200a disc, 1 for house, and 1 for ADU installed. p/s o/h n ok
ELE18-04848 Final12/31/20181/2/20191/2/2019 9:39:12 AMAPASS
Donny Phone #: ###-#### Ok final. 200a meter main located down the wall from original location. 2 grd rods, grds/neut seperated in new inside garage panel. Terminal barriers installed.
ELE18-04862 Permanent Service12/28/20181/2/20191/2/2019 8:56:25 AMACANC
100 amp over head service , tree pulled mast off building , meter base needs changed out Phone #: ###-#### Inspection requested via web by Kendra Lanham Talked to Todd. He is going to call in for inspection once 2nd grd rod is driven. It was an emer re-hookup on the 21st. Digline was contacted as gas meter was by existing location.