MEC98-00085
| INSP - Conference | 1/20/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | | PART |
|
|
/ / 342 - Jim's needs to shorten dryer duct and take out 90's
|
MEC98-00173
| INSP - Gas pressure test | 1/20/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | | PASS |
|
|
/ / 342 -
|
BLD97-03467
| INSP - Footings | 1/20/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | | PART |
|
|
/ / 342 - remaining ftg ok, random sampling of 1/2 poured appears ok
|
BLD97-03467
| INSP - Conference | 1/20/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | | PART |
|
|
/ / 342 - assured by cameron soils report is done, incomplete set of p will have at stem wall insp or enginering requirement stands.
|
BLD98-00017
| INSP - Carpentry | 1/20/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | | FAIL |
|
|
/ / 342 - need hdrs, ftg, fdn, blocking, drainage away from structure, hdr hangers in lieu of trmmrs and that's about it.
|
BLD98-00017
| INSP - Set-back | 1/20/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | | FAIL |
|
|
/ / 342 - called but answering svc only
|
MEC98-00085
| INSP - Final | 1/16/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | A | PASS |
|
|
01/20/98 342 - ###-#### ELDEN\\AC,FURN,GAS TEST
|
MEC98-00085
| INSP - Final | 1/16/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | A | PASS |
|
|
01/20/98 342 - ###-#### ELDEN\\AC,FURN,GAS TEST
|
MEC98-00049
| INSP - Final | 1/20/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | P | NR |
|
|
01/20/98 342 - AFTER 3;00\JIM ###-#### need to 90 vent away from bathroo
|
MEC98-00049
| INSP - Final | 1/20/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | P | NR |
|
|
01/20/98 342 - AFTER 3;00\JIM ###-#### need to 90 vent away from bathroo
|
MEC98-00173
| INSP - Framing/ Rough-in | 1/20/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | P | FAIL |
|
|
01/20/98 342 - ###-#### draft stops, no fans, 1" to combustibles
|
BLD97-03467
| INSP - Framing/Rough-in | 1/20/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | P | FAIL |
|
|
01/20/98 342 - after 3:00 footing poured w/o inspection
|
MEC98-00147
| INSP - Framing/ Rough-in | 1/20/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | P | PASS |
|
|
01/20/98 342 - reinspection
|
MEC98-00171
| INSP - Framing/ Rough-in | 1/20/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | P | CANC |
|
|
PRESSURE TEST AND R\I ###-#### SHAWNA Cancelled by Hello! (Last update by [RD ]). Contact: [3226007].
|
BLD98-00017
| INSP - Framing/Rough-in | 1/20/1998 | 1/20/1998 | 1/20/1998 12:00:00 AM | P | NR |
|
|
01/20/98 342 - CONFERENCE/CHUCK ###-#### CALL FOR A TIME TO MEET/CALL AN MEET.
|