BLD99-02051
| BLD-Framing/Rough-in | 1/20/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | P | PART |
|
|
Verified 2hr wall construction at rooms 227,228,226,225. 4" penetration requires fire assembly. Also verified 2hr wall costruction in room 812, 2hr wall in bathroom of this room not complete. Coridoors at both 2hr wall locations require reinspection on penetrations.
|