PLM99-04011
| Final | 1/19/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | A | PASS |
|
|
###-#### bob fn Final ok. 1/20/00 9:24:01 AM
|
PLM99-03575
| Final | 1/19/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | A | NR |
|
|
Steve ###-####
|
PLM99-03575
| Final | 1/20/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | A | PASS |
|
|
Final ok with exisitng sump ad single pump.
|
PLM99-04035
| Final | 1/20/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | P | PASS |
|
|
###-#### Final ok. 1/21/00 9:01:56 AM
|
PLM99-03422
| Plumbing Rough-in | 1/20/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/20/2000 at 11:18:13. Contact: ###-####. Complete piping test. 1/21/00 9:02:04 AM
|