BLD99-02099
| BLD-Framing/Rough-in | 1/19/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | A | CANC |
|
|
2###-#### John
|
BLD99-02629
| BLD-Final | 1/19/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/19/2000 at 11:38:17. Contact: . C/N issued subject to 1 to 1 slope within 4' of structural elements of house. 1/21/00 8:46:36 AM
|
BLD99-03605
| BLD-Framing/Rough-in | 1/19/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | A | FAIL |
|
|
###-#### 7 items not to plan, engineering or truss engineering. 1/21/00 8:46:08 AM
|
BLD99-03572
| BLD-Footing | 1/19/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | A | PART |
|
|
RANDY-- ###-#### FT INSP
|
BLD99-02967
| BLD-Final | 1/19/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | A | FAIL |
|
|
###-#### ED No one on site incorrect directions. 1/21/00 8:45:45 AM
|
MEC99-04094
| Final | 1/20/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/20/2000 at 07:35:14. Contact: ###-####.
|
BLD99-03309
| BLD-Final | 1/20/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | P | FAIL |
|
|
###-#### John key above front door Exposed footings, final grading not done, sidewalks not done etc. 1/21/00 8:50:53 AM
|
BLD00-00054
| BLD-Framing/Rough-in | 1/20/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | P | PASS |
|
|
stem wall-- jake-- ###-#### ext 17145 Check 5/8" bolt placement @ frame. 1/21/00 8:47:04 AM
|
BLD99-03536
| BLD-Conference | 1/20/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | P | FAIL |
|
|
jared ###-#### Resubmit changes in duplicate for approval. 1/25/00 11:42:20 AM
|
BLD99-03436
| BLD-Framing/Rough-in | 1/20/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/20/2000 at 10:37:15. Contact: ###-####. Truss nailing and nail strap beam @ porch. 1/21/00 8:47:30 AM
|
BLD99-03427
| BLD-Energy code compliance | 1/19/2000 | 1/20/2000 | 1/20/2000 12:00:00 AM | P | PART |
|
|
###-#### bryan Given to 325. 1/25/00 11:42:30 AM
|