Inspections for the day of: Tuesday, January 20, 2009.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE08-00706 Final1/20/20091/20/20091/20/2009 2:45:56 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Alison Pennington ok
ELE08-02690 Electrical Rough-In1/20/20091/20/20091/20/2009 2:11:51 PMPFAIL
rick - ###-#### - Note: please call for instructions covered before inspection and emergency ballast mounted on combustible material 410.136 called
ELE08-02689 Electrical Rough-In1/20/20091/20/20091/20/2009 2:10:25 PMPFAIL
rick ###-#### Note: please call for instruction called wiring covered before inspection, address emergency ballast mounted on combustible material
ELE08-02740 ELE-Aging Inspection1/20/20091/20/20091/20/2009 1:30:10 PM PART
stopped at site no electrical ready at this time wsuc
ELE08-02394 Electrical Rough-In1/20/20091/20/20091/20/2009 12:43:05 PMPPART
JOE - ###-#### NOTE: OVERHEAD
partial r/i for ceilings anop
ELE09-00090 Electrical Rough-In1/16/20091/20/20091/20/2009 9:34:34 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Dan Mitchell no esc
r/i ok
ELE09-00090 Final1/20/20091/20/20091/20/2009 9:34:04 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
ELE08-02563 Electrical Rough-In1/19/20091/20/20091/20/2009 9:04:41 AMAPART
Scheduled by a contractor via Hello! on 1/19/2009 at 7:08:21 AM. Contact: ###-####. ceilings 3rd floor phase #2 anop
ELE08-02562 Final1/16/20091/20/20091/20/2009 9:03:36 AMAPASS
Scheduled by a contractor via Hello! on 1/16/2009 at 1:37:29 PM. Contact: ###-####. FINAL FOR PHASE #1 note some work was inspected on ele-08-02563
by mistake, but everything has been inspected. Phase #! was on both 2nd and 3rd floors ok card signed