Inspections for the day of: Tuesday, January 20, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00179 General Inspection1/20/20091/20/20091/20/2009 4:57:40 PMPPASS
MIS08-00133 BLD-Conference1/20/20091/20/20091/20/2009 4:06:01 PMANR
BLD08-02110 BLD-Final1/20/20091/20/20091/20/2009 4:04:16 PMANR
Need Electr final
BLD08-00475 BLD-Framing/Rough-in1/19/20091/20/20091/20/2009 4:03:08 PMPPART
Scheduled by a contractor via Hello! on 1/19/2009 at 11:41:42 AM. Contact: ###-####.
OK to (1) side all walls........OK to insulate. C/N......Protect penitrations in 1hr wall at book deposit room......ie. Sewer clean out and water valve.
ESC08-01040 General Inspection1/20/20091/20/20091/20/2009 4:00:31 PMPPASS
Jay phone ###-####
BLD08-02562 BLD-Framing/Rough-in1/20/20091/20/20091/20/2009 4:00:13 PMPPASS
jay Phone #: ###-####
BLD06-03137 BLD-Final1/17/20091/20/20091/20/2009 3:59:51 PMPPART
Scheduled by a contractor via Hello! on 1/17/2009 at 9:27:50 AM. Contact: ###-####.
OK for temp occ on unit 14B only. OK to Perm when all trades Perm on remaining (3) units included on this permit. Note: Fire has approved for Perm. Occ on all four units.
BLD08-02139 BLD-Framing/Rough-in1/19/20091/20/20091/20/2009 10:01:26 AMAPART
Scheduled by a contractor via Hello! on 1/19/2009 at 9:56:47 AM. Contact: ###-####.
Roof blocking and nailing at diaphram perimeter and at (2) drag struts OK pending inspection and approval from Structural Engineer. Roof framing at areas of TJI roof joists OK. OK to insulate selected areas.