ESC08-00179
| General Inspection | 1/20/2009 | 1/20/2009 | 1/20/2009 4:57:40 PM | P | PASS |
|
|
|
MIS08-00133
| BLD-Conference | 1/20/2009 | 1/20/2009 | 1/20/2009 4:06:01 PM | A | NR |
|
|
|
BLD08-02110
| BLD-Final | 1/20/2009 | 1/20/2009 | 1/20/2009 4:04:16 PM | A | NR |
|
|
Need Electr final
|
BLD08-00475
| BLD-Framing/Rough-in | 1/19/2009 | 1/20/2009 | 1/20/2009 4:03:08 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 1/19/2009 at 11:41:42 AM. Contact: ###-####. OK to (1) side all walls........OK to insulate. C/N......Protect penitrations in 1hr wall at book deposit room......ie. Sewer clean out and water valve.
|
ESC08-01040
| General Inspection | 1/20/2009 | 1/20/2009 | 1/20/2009 4:00:31 PM | P | PASS |
|
|
Jay phone ###-####
|
BLD08-02562
| BLD-Framing/Rough-in | 1/20/2009 | 1/20/2009 | 1/20/2009 4:00:13 PM | P | PASS |
|
|
jay Phone #: ###-####
|
BLD06-03137
| BLD-Final | 1/17/2009 | 1/20/2009 | 1/20/2009 3:59:51 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 1/17/2009 at 9:27:50 AM. Contact: ###-####. OK for temp occ on unit 14B only. OK to Perm when all trades Perm on remaining (3) units included on this permit. Note: Fire has approved for Perm. Occ on all four units.
|
BLD08-02139
| BLD-Framing/Rough-in | 1/19/2009 | 1/20/2009 | 1/20/2009 10:01:26 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 1/19/2009 at 9:56:47 AM. Contact: ###-####. Roof blocking and nailing at diaphram perimeter and at (2) drag struts OK pending inspection and approval from Structural Engineer. Roof framing at areas of TJI roof joists OK. OK to insulate selected areas.
|