Inspections for the day of: Tuesday, January 20, 2009.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00490 General Inspection1/20/20091/20/20091/20/2009 4:05:54 PMPPASS
looked ok
ESC05-01531 General Inspection1/20/20091/20/20091/20/2009 4:04:44 PMPPASS
looked ok
ELE09-00037 Conference1/16/20091/20/20091/20/2009 4:03:42 PMPDONE
High Bob,
This is the job with the furniture power issue. Please call ###-####, it is my onsite foremens number, call 30min. before arrival. If he doesn''t answer my cell number is ###-####, and my contractors number is ###-####. Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig met contractor, told them that if too many circuits, could use relay control system for common disconnect, or if use whips, ensure labelling at furniture and at panel, circuits may fit readily available equipment (breakers), no esc this project
ESC07-00876 General Inspection1/20/20091/20/20091/20/2009 3:24:49 PMPPASS
looked ok
ESC08-01010 General Inspection1/20/20091/20/20091/20/2009 3:24:04 PMAPASS
looked ok
ELE09-00093 Conference1/20/20091/20/20091/20/2009 3:19:38 PMPDONE
rod Phone #: ###-#### reviewed upgrade of service and corrections for work done by others without permit and making corrections necessary, no esc this project
ELE08-03264 Electrical Rough-In1/18/20091/20/20091/20/2009 2:32:43 PMPNH
Please call 45 minutes prior so I can meet you to let you in. Internet Inspection Request from: sam petterson called 3 times, left message, left card, fee due
ELE08-02208 Electrical Rough-In1/20/20091/20/20091/20/2009 2:05:26 PMPPASS
JASON Phone #: ###-#### walls for patio and stairwells ok to cover anop
ELE08-02208 Permanent Service1/20/20091/20/20091/20/2009 1:06:41 PMPCANC
JASON Phone #: ###-#### see conference
ELE08-02208 Conference1/20/20091/20/20091/20/2009 1:06:16 PMPDONE
JASON Phone #: ###-#### reviewed grounding for services and labelling, terminations
ELE08-00407 Electrical Rough-In1/20/20091/20/20091/20/2009 12:19:51 PMPPASS
joe Note: ceiling cover Phone #: ###-#### ok to cover ceiling anop
ELE08-03251 Final1/16/20091/20/20091/20/2009 9:41:56 AMAPASS
Brandon Phone #: ###-#### ok to final
ELE09-00055 Electrical Rough-In1/19/20091/20/20091/20/2009 9:02:40 AMAPASS
rough in inspection for new circuit for A/C. Please final at same time if possible. A/C is for data room next to break room. Electrician is no longer on site. Please call if you want him to meet you there ###-####. thank you Phone #: ###-#### Internet Inspection Request from: Carla Ward ric ok, ok to final, no esc this project
ELE09-00055 Final1/20/20091/20/20091/20/2009 9:02:24 AMAPASS
rough in inspection for new circuit for A/C. Please final at same time if possible. A/C is for data room next to break room. Electrician is no longer on site. Please call if you want him to meet you there ###-####. thank you Phone #: ###-#### Internet Inspection Request from: Carla Ward ok to final, no card to sign, no esc this project
ELE08-02943 Electrical Rough-In1/19/20091/20/20091/20/2009 8:10:44 AMANR
Please provide cover and ceiling inspection for bar. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean met contractor, building contractor made changes to delay electrcal, told fee due for re-inspectionn no esc this project