Inspections for the day of: Friday, January 20, 2012.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00894 Site Preparation1/20/20121/20/20121/30/2012 8:11:28 AM DEFR
no work at this time
GCB11-00062 GCB-Courtesy1/19/20121/20/20121/24/2012 7:11:58 AMAPASS
Kevin @ ###-####Call to schedule time they will get a letter from the enginer oking the footings and colmns they will also get spec. inspection for the epoxy bolts and a325 bolting
GCB11-00069 GCB-Footing1/19/20121/20/20121/20/2012 3:37:47 PMAPASS
Jerry @ ###-####3 PM Inspection
BLD11-02324 BLD-Final1/19/20121/20/20121/20/2012 3:34:29 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy
BLD11-02494 BLD-Energy code compliance1/19/20121/20/20121/20/2012 3:34:09 PMPPASS
after 3 if possible Phone #: ###-#### >> Inspection requested via web by Todd Blackwell
BLD11-02495 BLD-Energy code compliance1/19/20121/20/20121/20/2012 3:33:50 PMPPASS
after 3 if available Phone #: ###-#### >> Inspection requested via web by Todd Blackwell
BLD11-01816 BLD-Energy code compliance1/20/20121/20/20121/20/2012 1:10:54 PMAPASS
Karen ###-####
BLD11-02332 BLD-Final1/19/20121/20/20121/20/2012 12:57:00 PMPPART
Doors are complete. Permit plans are in corner by electrical panel (near hallway). Thanks! Phone #: ###-#### >> Inspection requested via web by Todd Weltner ok for temp occ ok for perm occ after bldg is finaled.
GCB11-00102 GCB-Final1/19/20121/20/20121/20/2012 10:53:18 AMAPASS
Elliot @ ###-####
GCB11-00043 GCB-Final1/19/20121/20/20121/20/2012 10:50:55 AMAPASS
Darin @ ###-####Call 30 mins in advance for access