ESC11-00894
| Site Preparation | 1/20/2012 | 1/20/2012 | 1/30/2012 8:11:28 AM | | DEFR |
|
|
no work at this time
|
GCB11-00062
| GCB-Courtesy | 1/19/2012 | 1/20/2012 | 1/24/2012 7:11:58 AM | A | PASS |
|
|
Kevin @ ###-####Call to schedule time they will get a letter from the enginer oking the footings and colmns they will also get spec. inspection for the epoxy bolts and a325 bolting
|
GCB11-00069
| GCB-Footing | 1/19/2012 | 1/20/2012 | 1/20/2012 3:37:47 PM | A | PASS |
|
|
Jerry @ ###-####3 PM Inspection
|
BLD11-02324
| BLD-Final | 1/19/2012 | 1/20/2012 | 1/20/2012 3:34:29 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy
|
BLD11-02494
| BLD-Energy code compliance | 1/19/2012 | 1/20/2012 | 1/20/2012 3:34:09 PM | P | PASS |
|
|
after 3 if possible Phone #: ###-#### >> Inspection requested via web by Todd Blackwell
|
BLD11-02495
| BLD-Energy code compliance | 1/19/2012 | 1/20/2012 | 1/20/2012 3:33:50 PM | P | PASS |
|
|
after 3 if available Phone #: ###-#### >> Inspection requested via web by Todd Blackwell
|
BLD11-01816
| BLD-Energy code compliance | 1/20/2012 | 1/20/2012 | 1/20/2012 1:10:54 PM | A | PASS |
|
|
Karen ###-####
|
BLD11-02332
| BLD-Final | 1/19/2012 | 1/20/2012 | 1/20/2012 12:57:00 PM | P | PART |
|
|
Doors are complete. Permit plans are in corner by electrical panel (near hallway). Thanks! Phone #: ###-#### >> Inspection requested via web by Todd Weltner ok for temp occ ok for perm occ after bldg is finaled.
|
GCB11-00102
| GCB-Final | 1/19/2012 | 1/20/2012 | 1/20/2012 10:53:18 AM | A | PASS |
|
|
Elliot @ ###-####
|
GCB11-00043
| GCB-Final | 1/19/2012 | 1/20/2012 | 1/20/2012 10:50:55 AM | A | PASS |
|
|
Darin @ ###-####Call 30 mins in advance for access
|