FIR10-00521
| FIR-Aging Inspection | 1/20/2012 | 1/20/2012 | 1/23/2012 2:56:04 PM | | NR |
|
|
I met with Tamara and Charlie and discussed the project status. The projects will be followed up on and their status relayed to me.
|
FIR10-00033
| FIR-Aging Inspection | 1/20/2012 | 1/20/2012 | 1/23/2012 2:55:51 PM | | NR |
|
|
I met with Tamara and Charlie and discussed the project status. The projects will be followed up on and their status relayed to me.
|
FIR10-00429
| FIR-Aging Inspection | 1/20/2012 | 1/20/2012 | 1/23/2012 2:55:31 PM | | NR |
|
|
I met with Tamara and Charlie and discussed the project status. The projects will be followed up on and their status relayed to me.
|
FIR11-00671
| INSP-Sprinkler Rough-in | 1/19/2012 | 1/20/2012 | 1/20/2012 3:55:52 PM | P | CANC |
|
|
As late in the day as possible. Nate is the contact. Thanks Phone #: ###-#### Overbooked due to other inspections and Micron facilities plan review.
|
FIR11-00371
| INSP-Sprinkler Rough-in | 1/20/2012 | 1/20/2012 | 1/20/2012 3:54:28 PM | P | CANC |
|
|
kevin Phone #: ###-#### Overbooked due to other inspections and Micron facilities plan review.
|
BLD11-02585
| FIRE-Conference | 1/20/2012 | 1/20/2012 | 1/20/2012 3:47:24 PM | P | DONE |
|
|
Jr and I went over life safety requirements which include the possible demolishion of an existing fire alarm system or making sure it is functional. Door hardware needs to be compliant as well as repairing/adding exit signs and emergency lights and fire extinguishers.
|
FIR11-00479
| INSP-Conference | 1/19/2012 | 1/20/2012 | 1/20/2012 3:30:24 PM | P | DONE |
|
|
Mike and I discussed not installing the two pendant heads in the soffit surrounding the sky light in the main entry/lobby. It is less than 4' at all points and typically only 18" wide. The sky light is covered by a sidewall sprinkler head. I'm ok with deleting the two soffit pendants. We also discussed scheduling cover inspections for the remaining areas
|
FIR12-00013
| INSP-Supply line flush | 1/19/2012 | 1/20/2012 | 1/20/2012 12:39:08 PM | P | FAIL |
|
|
The underground supply line is not buried deep enough, has been installed as 1 1/2" without the 2" starter and is not a continous run to the riser as shown on the plans.
|
FIR11-00641
| INSP-Sprinkler Rough-in | 1/19/2012 | 1/20/2012 | 1/20/2012 12:23:30 PM | A | PASS |
|
|
Sprinkler piping is ok to cover.
|
FIR12-00005
| INSP-Final Inspection | 1/19/2012 | 1/20/2012 | 1/20/2012 12:22:56 PM | A | FAIL |
|
|
Provide earthquake bracing as discussed and branchline restraints.
|
BLD11-02973
| FIRE-Alarm Testing | 1/19/2012 | 1/20/2012 | 1/20/2012 10:52:14 AM | A | DONE |
|
|
This was a pre-inspection for the fire alarm scope of work. It appears the device spacing is adequate. I discussed the need for EOL voltage verification.
|
FIR11-00688
| INSP-Sprinkler Rough-in/Hydro | 1/19/2012 | 1/20/2012 | 1/20/2012 10:49:55 AM | A | DONE |
|
|
This was a pre-inspection. I found strobe coverage overspaced off of the breakroom wall. I discussed the need for EOL voltage verification.
|
BLD11-03014
| FIRE-Final Inspection | 1/19/2012 | 1/20/2012 | 1/20/2012 10:25:35 AM | A | PASS |
|
|
life safety passed
|
BLD11-03013
| FIRE-Final Inspection | 1/19/2012 | 1/20/2012 | 1/20/2012 10:24:56 AM | A | PASS |
|
|
life safety passed
|