Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00004 General Inspection1/20/20121/20/20121/23/2012 4:13:21 PM FAIL
Verbal to RP:
Install additional sediment protection along the bottom of the top soil stockpile on the canal side. Maintain the perimeter sediment barriers along the Boise River side of the project. There are two areas where the sediment barrier is either being consumed by the stockpile and another part where there is a gap between the wattles. Will follow up on 1/27/2011 am.
ESC10-00495 General Inspection1/20/20121/20/20121/20/2012 4:56:20 PM PASS
ESC09-00352 General Inspection1/20/20121/20/20121/20/2012 4:37:08 PMPFAIL
Verbal to RP:
Re-install the rock check dam within the Wallings Corridor on the 5 acre parcel. There has been evidence of a dischage into the BOise River due to the sand sediment build up at the point of discharge from the storm event of 1.6inches with a 36 hour period. This event exceeded the 100 year storm event. WIll follow up on 1/23/2012
ESC11-00117 General Inspection1/20/20121/20/20121/20/2012 4:33:58 PMPPART
Verbal to Owner;
CLean up all sediment off of the hard surfaces that discharge from the 1.6 inch storm event. Provide additional BMP's for further pervention within the areas of failure.
ESC10-00657 General Inspection1/19/20121/20/20121/20/2012 4:32:20 PMAPASS
Site has held up well to the storm event that exceeded the 100yr storm event.
ESC11-00415 BMP Violation1/17/20121/20/20121/20/2012 4:31:41 PMADEFR
Moved to 1/23/2012
ESC11-00816 General Inspection1/19/20121/20/20121/20/2012 3:47:58 PMPPART
Verbal to RP:
Provide perimeter controls at the back of property along the perimeter. Post ESC sign where it is visable from the street. Will follow up on 1/23/2012AM.
ESC11-00709 General Inspection1/20/20121/20/20121/20/2012 3:46:06 PM CANC
MOved to 1/23/2012
ESC11-00681 General Inspection1/20/20121/20/20121/20/2012 3:43:42 PMPFAIL
Verbal to RP:
Clean up all sediment off of all hardsurfaces from the discharge that were influenced from the 1.6 inch of precipetation within the last 36 hours. Maijntain and add additional bmps on all of the slope area of the project. Repair the gully that has formed at the front the project with the culdisac. Will follow on 1/23/2012am.
ESC11-00698 Aging Inspection1/20/20121/20/20121/20/2012 3:38:23 PMPCANC
No actvity.
ESC11-00882 BMP Violation1/17/20121/20/20121/20/2012 3:26:05 PMAPART
Due to saturated soil the wash out has not been dug out.