FIR14-00890
| INSP-Conference | 1/20/2015 | 1/20/2015 | 1/22/2015 4:20:08 PM | P | DONE |
|
|
On site conference with contractor regarding SA locations at living units, NFPA 72 guidelines, plan review comments, and two way communication per IBC requirements.
|
BLD14-03289
| FIRE-Final Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 3:45:06 PM | P | PASS |
|
|
Fire life safety final approved.
|
BLD14-01691
| FIRE-Final Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 3:15:16 PM | P | PASS |
|
|
Fire life safety inspection completed acceptable.
|
BLD14-01124
| FIRE-Final Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 1:34:02 PM | P | PASS |
|
|
Previous correction items verified for completion. Vanilla shell fire life safety passed.
|
FIR15-00006
| INSP-Final Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 1:31:59 PM | P | PASS |
|
|
Scope of work completed, inspection passed. Permit finaled.
|
FIR14-00687
| INSP-Sprinkler Rough-in | 1/20/2015 | 1/20/2015 | 1/20/2015 11:42:18 AM | A | PART |
|
|
Intended for 5th floor wet system.
|
FIR14-00683
| INSP-Sprinkler Rough-in | 1/16/2015 | 1/20/2015 | 1/20/2015 11:39:42 AM | A | NR |
|
|
Bldg J dry and partial wet Pls call Leroy 30 mins prior Phone #: ###-#### Inspection requested via web by Jacci Hunt *NR per contractor
|
BLD15-00084
| FIRE-Final Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 10:17:57 AM | A | PASS |
|
|
Verified C/N items. Life safety finaled.
|
FIR14-00437
| INSP-Sprinkler Rough-in | 1/19/2015 | 1/20/2015 | 1/19/2015 7:24:05 PM | P | CANC |
|
|
Please schedule 24 hour air test. Must be done after 3:30 pm Please call Leroy 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|