BLD14-02362
| FIRE-Conference | 1/20/2015 | 1/20/2015 | 1/20/2015 3:41:33 PM | P | DONE |
|
|
Went over phasing of the project with Tom.
|
FIR14-00812
| INSP-Final Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 3:38:12 PM | P | CANC |
|
|
To be rescheduled for tomorrow morning.
|
FIR14-00934
| INSP-Sprinkler Rough-in | 1/20/2015 | 1/20/2015 | 1/20/2015 3:18:50 PM | P | PASS |
|
|
Reception and BreakRoom area piping is ok to cover.
|
BLD14-03413
| FIRE-Final Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 3:01:49 PM | P | PASS |
|
|
Life safety passed
|
BLD14-03523
| FIRE-Alarm Testing | 1/20/2015 | 1/20/2015 | 1/20/2015 2:45:36 PM | P | CANC |
|
|
No fire alarm testing was required.
|
BLD14-03523
| FIRE-Final Inspection | 1/19/2015 | 1/20/2015 | 1/20/2015 2:41:11 PM | P | FAIL |
|
|
Provide city approved plans, provide sprinkler modifications, provide tagged and mounted fire extinguisher, remove deadbolts, remove thumbturn dead bolt from main exit.
|
FIR14-00578
| INSP-Sprinkler Rough-in/Hydro | 1/19/2015 | 1/20/2015 | 1/20/2015 1:40:40 PM | P | PASS |
|
|
Underground flush passed
|
FIR15-00021
| INSP-Final Inspection | 1/19/2015 | 1/20/2015 | 1/20/2015 1:31:12 PM | P | PASS |
|
|
Permit finaled
|
FIR14-00538
| INSP-Sprinkler Rough-in/Hydro | 1/20/2015 | 1/20/2015 | 1/20/2015 1:16:55 PM | P | FAIL |
|
|
Overhead hydro test failed
|
FIR14-00574
| INSP-Supply line flush | 1/19/2015 | 1/20/2015 | 1/20/2015 12:33:55 PM | P | PASS |
|
|
Underground flush passed
|
FIR14-00745
| INSP-Sprinkler Rough-in/Hydro | 1/20/2015 | 1/20/2015 | 1/20/2015 12:17:20 PM | P | PART |
|
|
Rick-24 hr air test started at 10:00am with 40 psi on the guage
|
FIR13-00723
| INSP-Sprinkler Rough-in | 1/20/2015 | 1/20/2015 | 1/20/2015 10:06:09 AM | A | PASS |
|
|
overhead rough in passed. Hard lids ok to cover. Will need an additional rough-in inspection when drops have been piped to grid.
|
NAF14-00006
| INSP-Final | 1/16/2015 | 1/20/2015 | 1/20/2015 9:46:53 AM | A | PART |
|
|
Only Lot 10 (3606) is passed. Lot 9 is not complete.
|