ESC14-00157
| General Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 4:17:56 PM | | PASS |
|
|
WIP. Frame is up. Contractors parking on street, no trackout; permit posted.
|
ESC14-00045
| General Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 1:36:02 PM | | PASS |
|
|
WIP. Permit posted. No corrections needed at this time.
|
ESC14-00163
| Aging Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 1:12:27 PM | | PASS |
|
|
Spec home exterior and landscaping complete and site has been cleaned. BLD still open but ESC permit conditions satisfied. Tianna Park homes still in progress have open permits for inspections.
|
ESC14-00163
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 1:11:56 PM | P | PASS |
|
|
|
ESC14-00163
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 1:11:14 PM | P | PASS |
|
|
|
ESC14-00160
| Aging Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 1:11:05 PM | | PASS |
|
|
Spec home exterior and landscaping is complete. Some minor interior work ongoing. Tianna Park is in decent condition, no trackout, and trash and materials are consolidated.
RP/GC Justin was onsite and stated he has trash cleanup and sweeping scheduled for later in the week.
|
ESC14-00160
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 1:09:10 PM | P | PASS |
|
|
|
ESC13-00230
| General Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 12:53:26 PM | | PASS |
|
|
Permit and SWPPP onsite for River Heights #5. Individual homes permitted seperately. BMPs including DI bags and lined concrete washout with stabilized drive-up are in good operating condition. No signiificant trackout and no on or offisite discharges observed
|
ESC14-01136
| Site Preparation | 1/20/2015 | 1/20/2015 | 1/20/2015 12:49:44 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
Permit posted, RH #5 projects currently in compliance through muddy condtions. Approved for excavation.
|
ESC14-01161
| Site Preparation | 1/19/2015 | 1/20/2015 | 1/20/2015 12:48:46 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
Permit posted. River Heights sub #5 BMPs are installed (DI bags/lined washout). Will need daily clean up during excavation and foundation work to control trackout due to muddy conditions in area.
|
ESC13-01028
| Site Preparation | 1/20/2015 | 1/20/2015 | 1/20/2015 12:41:30 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit posted. Two Tahoe homes in progress on both sides. Approved for construction.
|
ESC15-00015
| Site Preparation | 1/20/2015 | 1/20/2015 | 1/20/2015 12:15:58 PM | P | PASS |
|
|
Kim Phone #: ###-#### (syman inspector)
Finally Home Again Subdivision (Legacy Development)
Meet Andy with Syman onsite for walk through inspection.
Silt fence perimeter on low end of site is installed properly and in correct locations. SIte is currenty about 2 acres of pasture that will grubbed and graded (no infill required) and utililities installed. Some trench along Smith will occur.
Site is ready for excavation but has two remaining installations: 1. Permit and SWPPP sign at entrance 2. Stabilized construction entrance in the area of mud about 50 yards in from Smith.
Minor trackout from equipment unloading to be cleaned later today.
Approved.
|
ESC13-00655
| Site Preparation | 1/16/2015 | 1/20/2015 | 1/20/2015 10:44:16 AM | A | PART |
|
|
Note: not a site prep inspection....
Aberdeen Square has trash and materials contained, no major trackout leaving the development area, and no dirty runoff or discharges observed.
Correction:
This week as weather warms, Colehaven, Allumbaugh, and Raymod trough the two access drives requires street sweeping and general cleanup.
Verbal correction request made to RP Jeremy
|
ESC13-01308
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 10:21:52 AM | A | PASS |
|
|
Townhome complete and landscaped. ESC permit conditions satisfied.
|
ESC13-01307
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 10:20:10 AM | A | PASS |
|
|
Townhome complete and landscaped. ESC permit conditions satisfied.
|
ESC13-01306
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 10:19:34 AM | A | PASS |
|
|
Townhome complete and landscaped. ESC permit conditions satisfied.
|
ESC13-01293
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 10:17:06 AM | A | PASS |
|
|
Exterior of townhome is complete and landscaped. Building materials have been cleaned. BLD open due to interior work in progress. Pine Valley and Shoup streets in good condition and DI bags installed with good capacity.
|
ESC14-00017
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 10:15:42 AM | A | PASS |
|
|
Exterior of townhome is complete and landscaped. Building materials have been cleaned. BLD open due to interior work in progress. Pine Valley and Shoup streets in good condition and DI bags installed with good capacity.
|
ESC13-01297
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 10:14:46 AM | A | PASS |
|
|
Exterior of townhome is complete and landscaped. Building materials have been cleaned. BLD open due to interior work in progress. Pine Valley and Shoup streets in good condition and DI bags installed with good capacity.
|
ESC13-01298
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 10:13:55 AM | P | PASS |
|
|
Exterior of townhome is complete and landscaped. Building materials have been cleaned. BLD open due to interior work in progress. Pine Valley and Shoup streets in good condition and DI bags installed with good capacity.
|
ESC13-01291
| Aging Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 10:12:19 AM | | PASS |
|
|
Exterior of townhome is complete and landscaped. Building materials have been cleaned. BLD open due to interior work in progress. Pine Valley and Shoup streets in good condition and DI bags installed with good capacity.
|
ESC13-01290
| Aging Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 10:09:31 AM | | PASS |
|
|
WIP. Frame for building is up. No trackout on Pine Valley or Shoup. Debris and materials are contained. DI bags installed at Pine Tree Village. No corrections at this time.
|
ESC13-01292
| Aging Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 10:05:04 AM | | PASS |
|
|
Exterior of townhome is complete and landscaped. Building materials have been cleaned. BLD open due to interior work in progress. Pine Valley and Shoup streets in good condition and DI bags installed with good capacity.
|
ESC13-01292
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 10:04:48 AM | P | PASS |
|
|
|
ESC13-01291
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 10:02:51 AM | P | PASS |
|
|
|
ESC14-01026
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 9:48:27 AM | P | PASS |
|
|
Demo complete. No old building materials or debris left on site. Flat level site, partial vegetated no MS4 on street. To be developed. ESC permit finaled.
|
ESC14-00530
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 9:45:32 AM | P | PASS |
|
|
ESC inspections for project Beverly by ESC to be covered at ESC14-00528 & 529. Multiple permits at same site with multiple buildings that will be on seperate parcels upon being developed. No issues at site.
|
ESC14-00700
| General Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 9:43:11 AM | | PASS |
|
|
Site has been grubbed and graded and utilities installed. Pavement in place and vertical construction in progress. This phase is complete. Further work at Project Beverly is covered by ESC14-00###-####9.
No discharges or significant trackout at site. Permits posted. No corrections.
|
ESC14-00700
| DOC - Permit Finaled | 1/20/2015 | 1/20/2015 | 1/20/2015 9:40:40 AM | P | PASS |
|
|
|
ESC13-00930
| General Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 8:41:49 AM | | PASS |
|
|
WIP. No trackout or discharges outside of walled compound. No surface water within site. Approved.
|