ELE15-00293
| Conference | 1/20/2016 | 1/20/2016 | 1/20/2016 3:37:45 PM | P | PASS |
|
|
Discussed service sub-panel locations with Brain Millard. Determined both service panel overcurrent devices shall be relocated outside bathroom areas according to NEC 230.70(A)(2) and 240.24(E)
|