ELE17-00140
| Electrical Rough-In | 1/19/2017 | 1/20/2017 | 1/20/2017 2:18:55 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Terry Scott...
rough ok to cover
|
ELE16-02886
| Electrical Rough-In | 1/19/2017 | 1/20/2017 | 1/20/2017 1:20:39 PM | P | PASS |
|
|
Heated bathroom floors roughed in and ohm tested. Both sides Phone #: ###-#### Inspection requested via web by David McClellan
ok to cover
|
ELE17-00123
| Final | 1/20/2017 | 1/20/2017 | 1/20/2017 12:35:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher...
ok to final
|
ELE17-00123
| Permanent Service | 1/20/2017 | 1/20/2017 | 1/20/2017 12:35:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher....
p/s u/g rec ok
|
ELE15-01874
| Final | 1/20/2017 | 1/20/2017 | 1/20/2017 11:52:46 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dustin Kuester...
corrections made...ok to final
|
ELE13-00382
| Final | 1/18/2017 | 1/20/2017 | 1/20/2017 10:26:18 AM | A | PASS |
|
|
Jennifer Phone #: 8###-####....
ok to final
|
ELE17-00139
| Electrical Rough-In | 1/19/2017 | 1/20/2017 | 1/20/2017 10:04:34 AM | A | FAIL |
|
|
Please call Drew (###-####) 30 minutes ahead for access Phone #: ###-#### Inspection requested via web by Brad Girard....
receptacles shall not be installed within or directly over a bath tub or shower stall
|
ELE17-00062
| Rough-In Permanent Service | 1/19/2017 | 1/20/2017 | 1/20/2017 8:49:55 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn...
rough ok to cover p/s u/g n ok
|