FIR16-00284
| INSP-Sprinkler Rough-in | 1/19/2017 | 1/20/2017 | 1/20/2017 10:12:26 AM | A | PART |
|
|
Inspection was for Unit 105 (see plans). It appears per the obstruction charts of NFPA13R that two heads will need to be relocated. They have been marked on the plans and will be checked at the next inspection. The piping in this apartment can be covered.
|
BLD16-01291
| FIRE-Final Inspection | 1/19/2017 | 1/20/2017 | 1/20/2017 6:31:03 AM | A | PASS |
|
|
Life safety passed. Opticon tested and verified by Boise Fire. Contractor stated the side emergency gate has a Knox key and will be locked when snow can be cleared.
|
NAF16-00034
| INSP-Sprinkler Rough-in/Hydro | 1/18/2017 | 1/20/2017 | 1/18/2017 9:02:08 AM | P | CANC |
|
|
Call prior to going Phone #: 8017063435 >> Inspection requested via mobile web by Dan snith Inspection cancelled via mobile web on Wednesday, January 18, 2017.
|