BLD99-03381
| BLD-Foundation | 1/20/2000 | 1/21/2000 | 1/21/2000 12:00:00 AM | A | PASS |
|
|
###-#### walls ok 1/31/00 2:08:37 PM
|
BLD99-01599
| BLD-Final | 1/20/2000 | 1/21/2000 | 1/21/2000 12:00:00 AM | A | CANC |
|
|
Patrick ###-#### just for the breezeway
|
BLD99-03470
| BLD-Framing/Rough-in | 1/20/2000 | 1/21/2000 | 1/21/2000 12:00:00 AM | A | FAIL |
|
|
shear wall matt ###-#### No approved plan on site unable to insp. interior gyp. spec. do not cover w/o insp. C/N. 1/21/00 1:52:58 PM
|
BLD99-03572
| BLD-Foundation | 1/20/2000 | 1/21/2000 | 1/21/2000 12:00:00 AM | A | PART |
|
|
Randy ###-#### Work in progress. 1/21/00 1:52:32 PM
|
MIS00-00010
| BLD-Conference | 1/20/2000 | 1/21/2000 | 1/21/2000 12:00:00 AM | A | FAIL |
|
|
Complaint of working w/out permits.No valid permits since 97. Stop work posted investigation of work req. before (from all trades). 1/21/00 1:53:23 PM
|
BLD99-02967
| BLD-Final | 1/20/2000 | 1/21/2000 | 1/21/2000 12:00:00 AM | A | FAIL |
|
|
###-#### mark handrail posted c\n 1/31/00 2:06:10 PM
|
BLD98-01966
| BLD-Final | 1/20/2000 | 1/21/2000 | 1/21/2000 12:00:00 AM | P | CANC |
|
|
jame ###-####
|
MEC00-00153
| Final | 1/20/2000 | 1/21/2000 | 1/21/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/20/2000 at 13:59:34. Contact: ###-####.
|