Inspections for the day of: Friday, January 21, 2005.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorLane Manuel
TitleSTRUCTURAL INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-00888 BLD-Final1/20/20051/21/20051/21/2005 12:00:00 AMACANC
KIRT ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
to reschedule for PM 1/21/2005 11:08:09 AM
MEC05-00187 Rough-in1/20/20051/21/20051/21/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 1/20/2005 at 3:12:40 PM. Contact: ###-####.
MEC05-00187 Pressure Test1/20/20051/21/20051/21/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 1/20/2005 at 3:13:15 PM. Contact: ###-####. 20 psi 1/21/2005 11:34:31 AM
MEC05-00188 Rough-in1/20/20051/21/20051/21/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 1/20/2005 at 3:14:47 PM. Contact: ###-####.
MEC05-00188 Pressure Test1/20/20051/21/20051/21/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 1/20/2005 at 3:15:22 PM. Contact: ###-####.
20 psi. 1/21/2005 11:33:41 AM
BLD04-02729 BLD-Final1/20/20051/21/20051/21/2005 12:00:00 AMPPASS
gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
MEC05-00242 Rough-in1/20/20051/21/20051/21/2005 12:00:00 AMPPASS
Scott-concrete is dry enough/2lb gas 60 instead of 30; Phone #: ###-#### Internet Inspection Request from: Jan Rice
gas tests also ok. 1/21/2005 3:31:43 PM
MIS05-00011 BLD-Final1/20/20051/21/20051/21/2005 12:00:00 AMPFAIL
dana -- ###-####--call 1st before insp
needs to comply w/ fire insp. corrections: hardware, signage, annual insp., etc. 1/21/2005 3:09:29 PM
MEC04-03302 Final1/21/20051/21/20051/21/2005 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: Matt Hansen
BLD04-00888 BLD-Final1/21/20051/21/20051/21/2005 12:00:00 AMPPART
temp c of o OK. Left C/N @ jobsite.