Inspections for the day of: Wednesday, January 21, 2009.
Number of inspections: 26
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00532 Random Inspection1/21/20091/21/20091/21/2009 4:27:02 PMPPART
Had contractor contain soil pile at south parking lot with waddles. Correction made while on site.
BLD08-01321 BLD-Framing/Rough-in1/21/20091/21/20091/21/2009 4:25:50 PMPPART
Performed general walk through to see progress of job. Noted that contractor has received membrane and thru penetration details from architect. wip
BLD08-01321 BLD-Footing1/21/20091/21/20091/21/2009 4:24:24 PMPPASS
Remainder of footing for masonry screen wall.
ESC08-00899 Site Preparation1/21/20091/21/20091/21/2009 11:08:15 AMAPART
All BMP's in place. GAve RP verbal c/n to post ESC permit signs.
BLD08-02205 BLD-Footing1/20/20091/21/20091/21/2009 11:07:29 AMAPASS
Jim-###-####. Exterior perimeter footings.
ESC08-00900 Site Preparation1/21/20091/21/20091/21/2009 11:06:58 AMAPART
All BMP's in place. Gave RP verbal c/n to post ESC permit signs.
BLD08-02206 BLD-Footing1/20/20091/21/20091/21/2009 11:06:10 AMAPASS
Jim-###-####. Exterior perimeter footings.
ESC08-00901 Site Preparation1/21/20091/21/20091/21/2009 11:05:43 AMAPART
All BMP's in place. Gave RP verbal c/n to post ESC permit signs.
BLD08-02207 BLD-Footing1/20/20091/21/20091/21/2009 11:05:09 AMAPASS
Exterior perimeter footings.
ESC08-00895 Site Preparation1/21/20091/21/20091/21/2009 11:04:41 AMAPART
All BMP's in place. Gave RP verbal c/n to post ESC permit signs.
BLD08-02201 BLD-Footing1/20/20091/21/20091/21/2009 11:04:02 AMAPASS
Jim-###-####. Exterior permiter footings.
ESC08-00896 Site Preparation1/21/20091/21/20091/21/2009 11:03:38 AMAPART
All BMP's in place. Gave RP verbal c/n to post ESC permit signs.
BLD08-02202 BLD-Footing1/20/20091/21/20091/21/2009 11:03:00 AMAPASS
Jim-###-####. Exterior perimeter footings.
ESC08-00897 Site Preparation1/21/20091/21/20091/21/2009 11:02:20 AMAPART
All BMP's in place. Gave RP verbal c/n to post ESC permit signs.
BLD08-02203 BLD-Footing1/20/20091/21/20091/21/2009 11:01:35 AMAPASS
Jim-###-####. Exterior permiter footings.
ESC08-00898 Site Preparation1/21/20091/21/20091/21/2009 11:01:11 AMAPART
BMP's in place. Gave RP verbal c/n to post ESC signs.
BLD08-02204 BLD-Footing1/20/20091/21/20091/21/2009 11:00:35 AMAPASS
Jim-###-####. Exterior permiter footings ok.
ESC08-00889 Site Preparation1/21/20091/21/20091/21/2009 11:00:06 AMAPART
All BMP's in place. Gave RP verbal c/n to post ESC signs.
BLD08-02197 BLD-Footing1/20/20091/21/20091/21/2009 10:59:25 AMAPASS
Jim-###-####. Exterior permiter footings.
ESC08-00890 Site Preparation1/21/20091/21/20091/21/2009 10:58:39 AMAPART
All BMP's in place. GAve RP verbal c/n to [post ESC signs.
BLD08-02198 BLD-Footing1/20/20091/21/20091/21/2009 10:58:01 AMAPASS
Jim-###-####. Exterior perimeter footings.
ESC08-00892 Site Preparation1/21/20091/21/20091/21/2009 10:48:45 AMAPART
All BMP's inplace. Gave RP verbal c/n to post ESC signs.
BLD08-02199 BLD-Footing1/20/20091/21/20091/21/2009 10:47:59 AMAPASS
Exterior permiter footings.
ESC08-00894 Site Preparation1/21/20091/21/20091/21/2009 10:47:07 AMAPART
Conc. washout in place. BMP's in place. Gave RP verbal c/n to post ESC signs. Will reinspect tomorrow.
BLD08-02200 BLD-Footing1/20/20091/21/20091/21/2009 10:45:42 AMAPASS
Jim-###-####. Exterior permiter footings.
BLD08-02541 BLD-Framing/Rough-in1/20/20091/21/20091/21/2009 10:18:59 AMAPART
michael Phone #: ###-####. Interior steel stud framed wall for new 1hr. fire partition between new tenant and mall storage. Noted to contractor to remove all foam insul. and provide approved fire caulking for membrane and thru penetrations.