Inspections for the day of: Wednesday, January 21, 2009.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00811 Random Inspection1/14/20091/21/20091/22/2009 2:19:32 PMAPASS
ESC08-00639 Site Preparation1/13/20091/21/20091/22/2009 1:25:08 PMADONE
Lot still not perminately stabilized. But naturally becoming that way.
ESC08-00770 Random Inspection1/14/20091/21/20091/22/2009 1:24:08 PMAPASS
ESC08-00706 Tracking Control1/16/20091/21/20091/21/2009 4:59:28 PMPFAIL
Correction Notice to RP:
Clean up all tracking (sediment and debris) through out project area on all hard surfaces. Failure to comply by 1/23/09 PM will result in a stop work order. Will re-inspect on 1/23/09 4:45pm .
ESC08-01016 Tracking Control1/21/20091/21/20091/21/2009 3:49:51 PMPFAIL
Final Notice to RP:
Clean up all sediment and debris off of all hard surfaces.
Clean up all concrete spoil piles on lot to the north.
Will re-inspect on 1/23/09 AM. Due to the consistance of the pertaining violations;
Failure to comply with all violation on all lots of sub division will result in a Stop Work Order.
ESC08-00953 General Inspection1/16/20091/21/20091/21/2009 3:48:55 PMPFAIL
Final Notice to RP:
Clean up all sediment and debris off of all hard surfaces.
Will re-inspect on 1/23/09 AM. Due to the consistance of the pertaining violations;
Failure to comply with all violation on all lots of sub division will result in a Stop Work Order.
ESC08-01037 General Inspection1/16/20091/21/20091/21/2009 3:45:52 PMPPASS
ESC08-00575 Tracking Control1/15/20091/21/20091/21/2009 3:45:34 PMAPART
Left message with RP:
Make sure that subs clean up at the end of the day off any issues. (tracking or trash debris ect..)
ESC08-00758 Random Inspection1/21/20091/21/20091/21/2009 2:05:46 PMPFAIL
Verbal to RP:
Need to clean up all hard surfaces of all sediment and debris. Also make sure valley gutters are also cleared. Will re-inspect on 1/26/09
ESC08-00504 Site Final1/21/20091/21/20091/21/2009 1:55:40 PMAPASS
ESC08-00725 BMP Violation1/15/20091/21/20091/21/2009 1:47:34 PMAFAIL
Correction Notice:
1.Install wattles per industry standards.
2. Clean up allsediment off of hard surfaces.
Will re-inspect on 1/23/09 AM
ESC08-01023 General Inspection1/15/20091/21/20091/21/2009 1:33:49 PMAPART
Will re-inspect at later time due to unknown if being used as a access point on the west end of project.
ESC08-00539 Tracking Control1/21/20091/21/20091/21/2009 11:43:30 AMAFAIL
Verbal to RP:
Clean up all tracking off of the primary entrance. Also to clean up all concrete spoils outside of the wash out pit. Will re-inspect on 1/26/09 AM.
ESC08-00765 Tracking Control1/20/20091/21/20091/21/2009 11:20:04 AMPPASS
ESC08-00770 Random Inspection1/21/20091/21/20091/21/2009 11:07:44 AMAFAIL
Verbal to GC, could not reach the RP
Clean up all saw cutting residual and cover pit run by friday 1/23/09 PM. Will re-inspect on 1/26/09 AM.