FIR09-00737
| INSP-Final Inspection | 1/20/2010 | 1/21/2010 | 1/25/2010 4:52:37 PM | P | PASS |
|
|
After hours fire alarm testing completed satisfactory, permit finaled.
|
FIR09-00679
| INSP-Final Inspection | 1/20/2010 | 1/21/2010 | 1/25/2010 4:50:31 PM | P | PASS |
|
|
Fire alarm testing completed acceptable, permit finaled.
|
FIR09-00669
| INSP-Final Inspection | 1/20/2010 | 1/21/2010 | 1/21/2010 3:37:45 PM | A | PART |
|
|
Second and fourth floor fire sprinkler modifications passed.
|
BLD09-01578
| FIRE-Final Inspection | 1/21/2010 | 1/21/2010 | 1/21/2010 3:34:47 PM | P | PASS |
|
|
Corrections are complete, life safety inspection passed. Discussed scheduling for the structural final and occupancy approvals.
|
FIR09-00536
| INSP-Sprinkler Rough-in | 1/21/2010 | 1/21/2010 | 1/21/2010 3:32:55 PM | P | PART |
|
|
Overhead fire sprinkler installation at the library room 128 is acceptable. Cover okay pending satisfactory tenting for cold cavity protection. Also need to verify non-combustible insulation fill to meet the exception allowed for non-sprinklered concealed spaces per NFPA 13 as the uprights in this area per plans have been deleted.
|
BLD09-02241
| FIRE-Final Inspection | 1/19/2010 | 1/21/2010 | 1/21/2010 3:27:54 PM | A | PASS |
|
|
C/N items are finished with the exception of an approved "door to remain... " sign at the main entry. Owner to affix sign as discussed for verification prior to structural final inspection.
|
BLD09-02247
| FIRE-Final Inspection | 1/20/2010 | 1/21/2010 | 1/21/2010 1:37:52 PM | A | PASS |
|
|
Correction notice items verified for completion, life safety passed.
|