Inspections for the day of: Thursday, January 21, 2010.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00740 BMP Violation1/20/20101/21/20101/21/2010 3:56:36 PMAPASS
MIS10-00016 PLM-Conference1/21/20101/21/20101/21/2010 3:37:17 PMPFAIL
Verbal Educatio to the contractor with a written Correction Notice:
Explained to the contractor (RM Mechanical) even on a emergency repair once the point of source in turned off, It is now considered a repair and since the job was over 2 cubic yards of disturbed soil a permit is required through the city of Boise.

Also sinse the storm drain was not protected at the area of the project; Once complete with the project to vaccum out the storm drain and call the city for a re-inspection stating to us that it is complete with of a invoice oc schedule inspection during the vacuming of the storm drain inlet. Will re-inspect on 1/22/10 to see if cleaning has been complete.
ESC09-00769 Tracking Control1/21/20101/21/20101/21/2010 2:32:48 PMPFAIL
Correction Notice: (message to RP)
CLean up all sediment and debris off of all hard surfaces.
** Failure to comply will result in a stop work order. Will re-inspect on 1/22/10 AM.
ESC09-00770 Tracking Control1/21/20101/21/20101/21/2010 2:32:02 PMPFAIL
Correction Notice: (message to RP)
CLean up all sediment and debris off of all hard surfaces.
** Failure to comply will result in a stop work order. Will re-inspect on 1/22/10 AM.
ESC09-00544 DOC - Permit Finaled1/21/20101/21/20101/21/2010 1:28:41 PMPPASS
ESC10-00004 Site Preparation1/21/20101/21/20101/21/2010 1:24:24 PM CANC
Moved to a confrence.
ESC10-00004 Conference1/21/20101/21/20101/21/2010 1:23:53 PMPDONE
Went over the conditions of the project w/ the RP and also the developer.
City is requiring that all BMP's must be installed per the approved ESC plan that was submitted to the city. Also must schedule and pass a "Site Preperation" inspection of site and allBMP's prior to the start of all land disturbing activities. Failure to comply with this additional condition, a Stop Work Order will be issued. Will re-inspect once a inspection is scheduled and/or on 1/26/10am.
ESC09-00295 General Inspection1/20/20101/21/20101/21/2010 9:36:05 AMAPASS
renee--608 2892