BLD13-02828
| BLD-Footing | 1/21/2014 | 1/21/2014 | 1/21/2014 4:51:42 PM | P | PART |
|
|
Shane Phone #: ###-#### Bsmnt. footings......Advised Contr. (Shane) to double cover footings for 3 days Min,
|
ESC13-00735
| Site Final | 1/21/2014 | 1/21/2014 | 1/21/2014 4:46:20 PM | P | NR |
|
|
Mark phone
|
BLD13-01961
| BLD-Final | 1/21/2014 | 1/21/2014 | 1/21/2014 4:45:43 PM | P | PASS |
|
|
Ron ###-####
|
BLD13-01961
| BLD-Blower Door Test Results | 1/21/2014 | 1/21/2014 | 1/21/2014 4:45:17 PM | P | PASS |
|
|
3.3
|
BLD13-01167
| BLD-Final | 1/21/2014 | 1/21/2014 | 1/21/2014 4:40:20 PM | P | PASS |
|
|
Phone #: ###-####
|
BLD13-01167
| DOC - Permit Finaled | 1/21/2014 | 1/21/2014 | 1/21/2014 4:39:29 PM | P | PASS |
|
|
|
ESC13-00998
| Site Final | 1/21/2014 | 1/21/2014 | 1/21/2014 4:34:52 PM | P | NR |
|
|
Micah phone ###-####
|
BLD13-02271
| BLD-Foundation | 1/21/2014 | 1/21/2014 | 1/21/2014 4:27:40 PM | P | PART |
|
|
Ron-Please call at least 30 mins prior to inspection Phone #: ###-#### 80% of North wall...... Covered.......supplimental heat.
|
BLD13-02740
| BLD-Final | 1/20/2014 | 1/21/2014 | 1/21/2014 4:22:51 PM | A | PART |
|
|
Call Kjell at above number with any questions. Phone #: ###-#### >> Inspection requested via web by Kjell Ooms OK to occupy cross fit and yoga rooms.
|
BLD13-01961
| BLD-Blower Door Test Results | 1/21/2014 | 1/21/2014 | 1/21/2014 2:52:36 PM | P | PASS |
|
|
3.9
|
BLD13-02464
| BLD-Final | 1/21/2014 | 1/21/2014 | 1/21/2014 2:51:17 PM | P | PASS |
|
|
MIcah Phone #: ###-####
|
BLD13-02464
| DOC - Permit Finaled | 1/21/2014 | 1/21/2014 | 1/21/2014 2:50:50 PM | P | PASS |
|
|
|
BLD13-02508
| BLD-Wall Bracing | 1/21/2014 | 1/21/2014 | 1/21/2014 2:50:14 PM | P | PASS |
|
|
Chad Phone #: ###-####
|
BLD13-03243
| BLD-Final | 1/21/2014 | 1/21/2014 | 1/21/2014 2:49:38 PM | P | PASS |
|
|
jim Phone #: ###-####
|
BLD13-03243
| DOC - Permit Finaled | 1/21/2014 | 1/21/2014 | 1/21/2014 2:49:24 PM | P | PASS |
|
|
|
BLD13-03193
| BLD-Final | 1/21/2014 | 1/21/2014 | 1/21/2014 2:48:34 PM | P | PASS |
|
|
travis Phone #: ###-####
|
BLD13-03193
| DOC - Permit Finaled | 1/21/2014 | 1/21/2014 | 1/21/2014 2:47:47 PM | P | PASS |
|
|
|
GCB13-00085
| GCB-Fire Wall | 1/17/2014 | 1/21/2014 | 1/21/2014 2:47:10 PM | P | PART |
|
|
Dante ###-#### Double layer rock on East wall complete. Next step....columns.
|
BLD13-00595
| BLD-Ceiling Grid Inspection | 1/20/2014 | 1/21/2014 | 1/21/2014 2:44:54 PM | P | PASS |
|
|
Ceiling grid inspection of added corridor extension, DB Fitz, 12th floor, requested by Bob L. Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson Grid OK.
|
BLD13-00682
| BLD-Conference | 1/20/2014 | 1/21/2014 | 1/21/2014 2:43:23 PM | P | PASS |
|
|
CLA Ceiling inspection request of 12th floor corridor extension on CLA space. Requested by Bob L. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson Grid OK.
|
BLD13-01783
| BLD-Ceiling Grid Inspection | 1/17/2014 | 1/21/2014 | 1/21/2014 2:41:45 PM | P | PART |
|
|
Ceiling inspection, 16th floor Holland and Hart. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson Install Perimeter only.....OK.
|
BLD13-01782
| BLD-Ceiling Grid Inspection | 1/17/2014 | 1/21/2014 | 1/21/2014 2:40:12 PM | P | PART |
|
|
15th Floor Ceiling Grid inspection, Holland and Hart. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson Install Perimeter only.....OK
|
BLD13-03337
| BLD-Other | 1/17/2014 | 1/21/2014 | 1/21/2014 10:47:15 AM | A | PASS |
|
|
lance - insulation Phone #: ###-####
|
BLD13-03362
| BLD-Energy code compliance | 1/17/2014 | 1/21/2014 | 1/21/2014 10:37:54 AM | A | PART |
|
|
steve Phone #: ###-#### Foundation.
|
BLD13-03358
| BLD-Energy code compliance | 1/17/2014 | 1/21/2014 | 1/21/2014 10:37:03 AM | A | PART |
|
|
steve Phone #: ###-#### Foundation
|
BLD13-03364
| BLD-Energy code compliance | 1/17/2014 | 1/21/2014 | 1/21/2014 10:36:15 AM | A | PART |
|
|
steve Phone #: ###-#### Foundation
|
BLD13-03359
| BLD-Energy code compliance | 1/17/2014 | 1/21/2014 | 1/21/2014 10:35:30 AM | A | PASS |
|
|
steve Phone #: ###-####
|
BLD13-01961
| BLD-Final | 1/17/2014 | 1/21/2014 | 1/21/2014 10:35:01 AM | A | PASS |
|
|
|
BLD13-01961
| DOC - Permit Finaled | 1/21/2014 | 1/21/2014 | 1/21/2014 10:34:41 AM | P | PASS |
|
|
|
BLD13-01961
| BLD-Blower Door Test Results | 1/21/2014 | 1/21/2014 | 1/21/2014 10:34:30 AM | P | PASS |
|
|
3.3
|
BLD13-03298
| BLD-Ceiling Grid Inspection | 1/20/2014 | 1/21/2014 | 1/21/2014 10:27:32 AM | A | PASS |
|
|
Call Shawn for Access ###-#### Phone #: ###-#### >> Inspection requested via web by Brian McCoy
|
MIS13-00333
| BLD-Conference | 1/16/2014 | 1/21/2014 | 1/21/2014 10:25:59 AM | A | CANC |
|
|
check back.
|
BLD13-02508
| BLD-Framing/Rough-in | 1/17/2014 | 1/21/2014 | 1/21/2014 10:24:10 AM | A | PASS |
|
|
chad Phone #: ###-####
|
MIS13-00326
| BLD-Conference | 1/17/2014 | 1/21/2014 | 1/21/2014 10:09:18 AM | A | DONE |
|
|
Vernon phone .....same
|
BLD13-03262
| BLD-Framing/Rough-in | 1/17/2014 | 1/21/2014 | 1/21/2014 9:05:57 AM | A | PASS |
|
|
call me to find area thanks Phone #: ###-#### >> Inspection requested via web by Miles Hash
|
ESC13-00651
| General Inspection | 1/21/2014 | 1/21/2014 | | | |
|
|
|