FIR15-00893
| INSP-Sprinkler Rough-in | 1/21/2016 | 1/21/2016 | 1/21/2016 1:47:13 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered. Plans/as-builts need submitted showing the reduced scope of work.
|
BLD15-03651
| FIRE-Final Inspection | 1/20/2016 | 1/21/2016 | 1/21/2016 11:58:37 AM | A | FAIL |
|
|
The pendant sprinkler head at the new restroom is overspaced. The maximum spacing for these heads is 130 sq. ft. Also automatic flush bolts are needed for the inactive leaf of the main exit or get with plan review and see if hardware can be deleted.
|
BLD15-03223
| FIRE-Final Inspection | 1/20/2016 | 1/21/2016 | 1/21/2016 10:56:45 AM | A | FAIL |
|
|
Repair all exit signs and emergency lights and provide testing, provide egress sensors/request to exit buttons on the doors utilizing the mag locks, remove thumbturn dead bolts, contact scott arellano for guidence on the too narrow drive way around the south side of building and the now blocked off fire dept access from the adjoinging parking lot due to the new fence and three manual gates to the property that are not shown on the city approved plans.
|
FIR15-00894
| INSP-Final Inspection | 1/20/2016 | 1/21/2016 | 1/21/2016 10:54:03 AM | A | PASS |
|
|
Permit finaled
|
BLD15-04378
| FIRE-Final Inspection | 1/20/2016 | 1/21/2016 | 1/21/2016 10:53:36 AM | A | PASS |
|
|
Life safety passed
|
BLD15-04337
| FIRE-Final Inspection | 1/20/2016 | 1/21/2016 | 1/21/2016 10:53:14 AM | A | PASS |
|
|
Life safety passed. The locking hardware from the therapy area to the office needs to be removed due to the exit sign over the door. This needs to be changed as discussed prior to a building inspection.
|