BLD18-04521
| BLD-Wall cover | 1/21/2020 | 1/21/2020 | 1/21/2020 4:10:48 PM | P | CANC |
|
|
Building 12 - 2nd Floor Insulation and RC channel inspection for cover. Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD18-04521
| BLD-Energy code compliance | 1/21/2020 | 1/21/2020 | 1/21/2020 4:10:41 PM | P | PASS |
|
|
Building 12 - 2nd Floor Insulation and RC channel inspection for cover. Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD19-03925
| BLD-Framing/Rough-in | 1/21/2020 | 1/21/2020 | 1/21/2020 4:06:05 PM | P | PASS |
|
|
Curt Phone #: ###-####. Lean to ok.
|
BLD19-03364
| BLD-Energy code compliance | 1/21/2020 | 1/21/2020 | 1/21/2020 2:50:21 PM | P | PASS |
|
|
Sam Phone #: ###-####
|
BLD19-03942
| BLD-Framing/Rough-in | 1/21/2020 | 1/21/2020 | 1/21/2020 2:50:02 PM | P | FAIL |
|
|
Jeff Phone #: ###-####. Needs to remove tyvek for wall bracing inspection. Need to verify drag trusses on roof nailing. it is ok to spray ceiling roof deck with the 3 inches of closed cell spray insulation, install fir sprinklers. Will also need to complete foam seal prior to framing inspection..Also noted the the tung and groove material that is going to used on soffits requires Romeo Gervais or Ron Johnsons approval from the fire dpt.
|
BLD20-00067
| BLD-Final | 1/21/2020 | 1/21/2020 | 1/21/2020 1:18:32 PM | P | PASS |
|
|
call prior ''demo'' - Doug Phone #: ###-####
|
BLD20-00067
| DOC - Permit Finaled | 1/21/2020 | 1/21/2020 | 1/21/2020 1:18:20 PM | P | PASS |
|
|
|
BLD19-04372
| BLD-Framing/Rough-in | 1/17/2020 | 1/21/2020 | 1/21/2020 1:13:40 PM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
|
BLD19-03316
| BLD-Framing/Rough-in | 1/20/2020 | 1/21/2020 | 1/21/2020 11:01:24 AM | A | PASS |
|
|
can the inspector ring and hour before he goes there as i,am working on to jobs thanks Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD18-04294
| BLD-Ceiling Grid Inspection | 1/20/2020 | 1/21/2020 | 1/21/2020 9:31:26 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Roger Graves
|
BLD19-04257
| BLD-Framing/Rough-in | 1/17/2020 | 1/21/2020 | 1/21/2020 9:01:17 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs plumbing rough in inspection.
|
BLD19-04256
| BLD-Framing/Rough-in | 1/17/2020 | 1/21/2020 | 1/21/2020 8:51:24 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Missed bearing point on F7 floor truss. Provide approved fix for cut top chord on F13 floor truss. Ok to insulate.
|