BLD97-00401
| INSP - Conference | 1/22/1998 | 1/22/1998 | 1/22/1998 12:00:00 AM | A | PASS |
|
|
W/ DAN STUART RE SUBMITTAL FROM ANDERSON CONST RE 1HR HPM PIPING ENCLOSURE...WILL MEET W/ CONT NEXT WEEK
|
BLD97-02102
| INSP - Conference | 1/22/1998 | 1/22/1998 | 1/22/1998 12:00:00 AM | A | PASS |
|
|
W/ CONC. CONT.
|
BLD97-03592
| INSP - Framing/Rough-in | 1/21/1998 | 1/22/1998 | 1/22/1998 12:00:00 AM | A | PART |
|
|
###-#### JACOBSON\ SHE WILL BE HOME FROM 8:00 UNTIL 11:00 OR AFTER 3:30 per ba...SUN ROOM KIT??...NO PLAN, LOOKS OK. COMPLETED?
|
BLD97-03648
| INSP - Energy code compliance | 1/22/1998 | 1/22/1998 | 1/22/1998 12:00:00 AM | P | PASS |
|
|
PROBLEM MARK ###-####--OWNER WILL BE HOME
|
BLD97-03648
| INSP - Framing/Rough-in | 1/22/1998 | 1/22/1998 | 1/22/1998 12:00:00 AM | P | PASS |
|
|
reinsp
|
MEC98-00181
| INSP - Framing/ Rough-in | 1/22/1998 | 1/22/1998 | 1/22/1998 12:00:00 AM | P | NR |
|
|
please pete ###-####...called, left msg, no response...
|
BLD96-02800
| INSP - Conference | 1/22/1998 | 1/22/1998 | 1/22/1998 12:00:00 AM | P | PASS |
|
|
sent fax letter to Scott at lombard-conrad: detail ok if fasteners detailed
|
BLD97-02104
| INSP - Framing/Rough-in | 1/22/1998 | 1/22/1998 | 1/22/1998 12:00:00 AM | P | NR |
|
|
waterfront \\###-####....not frame insp, carpentry only
|
BLD97-02223
| INSP - Conference | 1/23/1998 | 1/22/1998 | 1/22/1998 12:00:00 AM | P | PASS |
|
|
w/ wes re c/n & mech...he wrote struct c/n, owner wants final asap, will need bond.
|
BLD97-02259
| INSP - Carpentry | 1/22/1998 | 1/22/1998 | 1/22/1998 12:00:00 AM | P | PASS |
|
|
got arch's detail & calcs from Ron Hill
|
BLD97-02497
| INSP - Foundation | 1/22/1998 | 1/22/1998 | 1/22/1998 12:00:00 AM | P | NR |
|
|
incorrect plan onsite
|
BLD97-03197
| INSP - Carpentry | 1/22/1998 | 1/22/1998 | 1/22/1997 12:00:00 AM | P | PART |
|
|
has incorrect eng's letter, need prior to pour. ok to begin perimeter ftgs,. need detail for pads w/ imbeds for steel frame; told to have builder call me.
|