Inspections for the day of: Monday, January 22, 2001.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01722 BLD-Final1/19/20011/22/20011/22/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/19/2001 at 11:27:03. Contact: ###-####. ok for l/c, card to bldr 1/22/2001 10:24:35 AM
BLD00-00732 BLD-Final1/19/20011/22/20011/22/2001 12:00:00 AMAFAIL
Mark ###-####, keep c/n ok for t/o 1/22/2001 9:16:41 AM
BLD00-03441 BLD-Framing/Rough-in1/19/20011/22/20011/22/2001 12:00:00 AMAPART
Don ###-####, clg, c/n ok'd 1/22/2001 2:43:57 PM
BLD00-01806 BLD-Final1/22/20011/22/20011/22/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 1/22/2001 10:27:23 AM demo w/ BLD00-01722
BLD00-01722 BLD-Framing/Rough-in1/22/20011/22/20011/22/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 1/22/2001 10:25:50 AM beam installed at cant; wall opening ok per eng'g.
MEC00-04249 Conference1/22/20011/22/20011/22/2001 12:00:00 AMAPART
Added by Inspector: 340 On 1/22/2001 9:27:34 AM re switch req'd near furn; chk at final
BLD00-03140 BLD-Final1/22/20011/22/20011/22/2001 12:00:00 AMPNR
###-#### call first to meet , need landings, hdwe at doors, etc. recall 1/22/2001 3:42:07 PM
BLD00-01631 BLD-Conference1/22/20011/22/20011/22/2001 12:00:00 AMPPART
Added by Inspector: 340 On 1/22/2001 2:47:22 PM shell of Adelmann bldg, questions re: eng's reports (not sent?) configuration of select framing at basement/2nd fl...verify; need special insp reports for conc, etc
BLD00-02754 BLD-Conference1/22/20011/22/20011/22/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 1/22/2001 5:06:45 PM w/301 re trusses; last inspection. trusses are inverted
BLD00-03635 BLD-Framing/Rough-in1/22/20011/22/20011/22/2001 12:00:00 AMPPART
###-#### ok to cover 2nd fl & bsmt; still need analysis of 2nd fl framing over game rm. .. do not cover game room. 1/22/2001 3:21:34 PM
BLD00-00514 BLD-Other1/22/20011/22/20011/22/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/22/2001 at 09:01:00. Contact: ###-####...spray-on fire proofing...pend spec insp report 1/22/2001 5:05:33 PM
BLD00-00514 BLD-Framing/Rough-in1/22/20011/22/20011/22/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/22/2001 at 09:01:45. Contact: ###-####. 4th fl r. rms ok 1/22/2001 4:05:08 PM