BLD01-03193
| BLD-Framing/Rough-in | 1/18/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | A | PART |
|
|
###-#### Shear OK 1/22/2002 11:50:51 AM
|
MEC02-00142
| Rough-in | 1/18/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/18/2002 at 13:33:09. Contact: ###-####.
|
MEC02-00142
| Pressure Test | 1/18/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/18/2002 at 13:33:17. Contact: ###-####. Reading 9 lb Called contr. 1/22/2002 11:45:50 AM
|
BLD01-02947
| BLD-Framing/Rough-in | 1/21/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 07:33:30. Contact: ###-####.
|
BLD01-03263
| BLD-Concrete | 1/21/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 09:04:20. Contact: ###-####.
|
BLD01-02950
| BLD-Framing/Rough-in | 1/21/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 09:36:38. Contact: . Shear OK. 1/22/2002 12:10:18 PM
|
BLD01-02928
| BLD-Energy code compliance | 1/21/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 14:54:59. Contact: ###-####. Frame OK. 1/22/2002 12:21:33 PM
|
BLD01-03196
| BLD-Energy code compliance | 1/21/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 15:00:22. Contact: ###-####. Frame pass 1/22/2002 11:24:04 AM
|
MEC02-00114
| Rough-in | 1/21/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 17:21:17. Contact: ###-####. C/N Seal range duct and finish cold air returns. 1/22/2002 11:17:35 AM
|
MEC02-00114
| Pressure Test | 1/21/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 17:21:25. Contact: ###-####.
|
BLD01-00964
| BLD-Framing/Rough-in | 1/22/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | P | PART |
|
|
###-#### john Should have been Conc slab insp...... Poured W/O City insp..... Need Letter Special insp. 1/22/2002 2:45:59 PM
|
BLD01-00965
| BLD-Framing/Rough-in | 1/22/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | P | PART |
|
|
###-#### Should have been Conc slab insp...... Poured W/O City insp.....Need letter from Special insp. 1/22/2002 2:48:38 PM
|
BLD01-00966
| BLD-Framing/Rough-in | 1/22/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | P | PART |
|
|
Should have been Conc slab insp..... Poured W/O city insp...... Need Letter from Special insp. 1/22/2002 2:50:43 PM
|
BLD01-00942
| BLD-Foundation | 1/22/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | P | PART |
|
|
Found rebar appears OK.... Pass pending STRATA concrete PSI results. 1/22/2002 2:36:32 PM
|
BLD01-00949
| BLD-Foundation | 1/22/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | P | PART |
|
|
Found rebar appears OK...... Pass pend STRATA concrete PSI OK 1/22/2002 2:37:58 PM
|
BLD01-00948
| BLD-Footing | 1/22/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | P | PART |
|
|
Need Eng. OK for reduced footing size....2" less Width and depth. 1/22/2002 2:32:11 PM
|
BLD01-00950
| BLD-Footing | 1/22/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | P | PART |
|
|
Need Eng. OK for reduced footing size....2" less in width and depth. 1/22/2002 2:33:08 PM
|