BLD01-00737
| BLD-Framing/Rough-in | 1/18/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | A | PART |
|
|
###-####. need to clairify mbr connection to steel beam and interior shear wall nailing. 1/22/2002 4:25:49 PM
|
BLD01-00729
| BLD-Framing/Rough-in | 1/21/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 14:46:56. Contact: ###-####.
|
BLD01-02998
| BLD-Wall cover | 1/21/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 15:22:14. Contact: ###-####.ok to side. 1/22/2002 10:45:10 AM
|
BLD00-02288
| BLD-Wall cover | 1/21/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 16:10:39. Contact: ###-####.
|
BLD01-01836
| BLD-Framing/Rough-in | 1/22/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | P | NR |
|
|
###-#### ANITA. there is no roof covering on this also it has a low slope,owner plans to put metal decking,plan shows a center post support at front beam no support,beam will need to be sized as 2-2x8 will not span the 14 foot width, and at this time I do not have beam software. 1/22/2002 4:30:22 PM 1/22/2002 4:31:03 PM
|
BLD01-03131
| BLD-Framing/Rough-in | 1/22/2002 | 1/22/2002 | 1/22/2002 12:00:00 AM | P | PART |
|
|
###-#### not ready for a frame inspection but went over some items with contractor to address when all other trades have approved r-i. 1/22/2002 4:28:27 PM
|